๐Ÿ›ข๏ธ Cinnamon Creek 14-9HR

Nance Petroleum Corporation ยท McKenzie County, ND ยท File #13487 ยท Generated 2026-02-13 12:00

API
3305302422
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 3 Application for Stripper Well Property Determination due to low production rate of 7.8 BOPD over 12 months, qualifying for separate property designation.
๐Ÿ“„ Letter from NDIC dated June 15, 2005
Indicates operator's strategy to maintain economic viability through regulatory exemptions for low-producing wells, potentially extending field life.
2005-06-13 General Oilfield Services
Tier 3 Request for approval to drill additional horizontal sidetrack lateral targeting Middle Bakken Dolomite, citing unsuccessful fracture stimulations in other NPC re-entries.โฐ TIME-SENSITIVE
๐Ÿ“„ Notice of Intent dated May 18, 2005
Reveals operator's pivot from fracture stimulation to openhole lateral exposure, indicating non-standard completion design due to formation challenges.
2005-05-18 Directional Drilling
Tier 3 Confidential status granted for well data until November 10, 2005, except production runs.โฐ TIME-SENSITIVE
๐Ÿ“„ NDIC letter dated May 10, 2005
Operator seeks to protect proprietary re-entry and completion strategies, indicating competitive sensitivity around horizontal drilling plans.
2005-05-10 General Oilfield Services
Tier 3 Re-entry project to plug back existing lateral and drill new horizontal lateral in Middle Bakken, with specific directional plan and azimuth adjustment.
๐Ÿ“„ Procedure document dated circa 2005
Demonstrates operator's intent to optimize reservoir access by re-orienting wellbore away from regional fracture trends, a non-routine design choice.
Relative Directional Drilling

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and surveying services
Immediate need for re-entry rig mobilization and sidetrack drilling, with surveys required post-completion, creating short-term opportunity in Q2-Q3 2005.
Completion and liner services
Project involves setting liners and packers in shale intervals, with urgency tied to regulatory approval timelines expiring in 2005.