โ† Back to Daily Permits

๐Ÿ›ข๏ธ OLSON 4-8H1

Continental Resources, Inc. ยท McKenzie County, ND ยท File #28279 ยท Generated 2026-02-07 11:26

API
33-053-05892
Target Formation
Three Forks
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Waiver requested for tubing/packer requirement during frac completion, citing casing strength and monitoring plans.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Notice dated June 13, 2014
Deviation from standard casing requirements for high-pressure operations, approved via waiver.
2014-06-13 Completions / Frac
Tier 3 Application for Stripper Well Determination filed, designating the well as a stripper well due to low production rates.
๐Ÿ“„ Letter dated July 23, 2024
Stripper well designation is non-routine for a recently completed horizontal well, indicating marginal economics or regulatory compliance strategy.
2024-07-19 General Oilfield Services
Tier 3 Change from flowing to rod pump production method.
๐Ÿ“„ Sundry Notice dated September 28, 2014
Non-routine production method change shortly after completion, suggesting early production decline or optimization needs.
2014-09-28 General Oilfield Services
Tier 3 Cement bond log shows inadequate isolation of Dakota Group, requiring frac string and monitoring.
๐Ÿ“„ Letter dated January 13, 2015
Post-completion cement issues necessitating remedial actions, non-routine for integrity.
2014-07-23 Completions / Frac
Tier 3 Request for suspension of drilling for up to 90 days to use smaller rig initially.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Notice dated May 21, 2014
Non-routine drilling suspension to optimize rig usage, with intent to complete later.
2014-05-21 Drilling Rigs
Tier 3 Waiver for leakproof container during drilling phase, justified by no filtration use.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Notice dated May 19, 2014
Regulatory waiver for environmental compliance during drilling, non-standard for ND operations post-2014 rules.
2014-05-19 Regulatory / Permitting

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Artificial lift and production optimization
Recent stripper designation and historical pump changes signal ongoing need for lift services to maintain marginal production.
Well integrity and cement remediation
Cement bond issues identified in 2015 require monitoring and potential squeezes, timing for intervention services.
Midstream logistics
Multiple transporters listed, indicating active oil movement; opportunities for logistics optimization post-production.