| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Well located in mapped landslide area, requiring erosion control, monitoring program, geotechnical report, and annual stabilization monitoring post-completion. ๐ NDIC letters dated August 16, 2017 and October 17, 2018; Geotechnical Evaluation Report dated December 20, 2013. Landslide areas impose additional regulatory and engineering constraints not typical for standard Bakken wells, potentially delaying operations and increasing costs. |
2017-07-21 | General Oilfield Services |
| Tier 3 |
Completion design specifies 35-stage frac using plug and perf with cemented liners, differing from some offset wells. ๐ Bakken Supplemental Information for Permits. Plug and perf is increasingly common but the stage count and cemented liner requirement indicate a specific, potentially optimized design for this well's geology. |
Unknown | Completions / Frac |