| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Permit renewal with GCP submission and no fuel additives in completionโฐ TIME-SENSITIVE ๐ Form 4 Sundry Notices Demonstrates regulatory compliance persistence and specific completion design choices avoiding certain additives |
2018-02-02 | General Oilfield Services |
| Tier 3 |
Well located in mapped landslide area requiring annual monitoring and geotechnical oversight ๐ Geotechnical Evaluation Report and Monitor Plan for Soil Stabilization Indicates operator commitment to long-term stability in high-risk terrain, not standard for all wells |
2017-07-21 | General Oilfield Services |
| Tier 3 |
Open hole log waiver granted with specific logging requirements ๐ Form 4 Notice of Intent Deviation from standard open hole logging, relying on offset data and reduced logging suite |
2015-12-07 | Mud / Fluids |
| Tier 3 |
Rig change from H&P 492 to H&P 516 for drilling ๐ Well Plan Summary Non-standard rig specification for extended reach lateral, differing from offset wells |
2015-11-17 | Drilling Rigs |