๐Ÿ›ข๏ธ CCU Mainstreeter 6-1-25TFH

Burlington Resources Oil & Gas Company, L.P. ยท Dunn County, ND ยท File #32511 ยท Generated 2026-02-13 11:56

API
Target Formation
Three Forks
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 3 Geotechnical evaluation report received by NDIC on July 21, 2017, recommending 2H:1V cut slopes due to landslide area instability.
๐Ÿ“„ Geotechnical Evaluation Report section
Indicates non-standard slope design in landslide-prone area, not typical for routine well pads.
2017-07-21 General Oilfield Services
Tier 3 Quarterly update submitted on December 14, 2015, modifying development plan to include 35-stage frac with plug and perf on cemented liners.โฐ TIME-SENSITIVE
๐Ÿ“„ Quarterly Update Q1-2016
Reveals shift from initial MB-only plan to include TF wells with specific completion design, not routine permit data.
2015-12-14 Completions / Frac
Tier 3 Use of closed-loop cuttings handling system, cuttings hauled to Tervita.
๐Ÿ“„ Well Plan Summary
Specifies non-standard waste management, not typical fresh water drilling.
Unknown Mud / Fluids
Tier 3 Annual monitoring of wellhead positions in landslide area, with Form 4 submissions by August 15 each year.โฐ TIME-SENSITIVE
๐Ÿ“„ Monitor Plan for Soil Stabilization
Imposes ongoing regulatory compliance not standard for non-landslide wells.
Relative General Oilfield Services
Tier 3 Permit application submitted in Q4 2015 for wells on existing pad, adding to 8-well configuration.
๐Ÿ“„ Quarterly Update Q1-2016
Shows consolidation of wells on existing pads to minimize surface disturbance, deviating from original spaced pads.
Relative Drilling Rigs
Tier 3 Specific cementing recipe: Production liner with 1:1:0 Poz:Lafarge Class G + 20% Silica Flour + 8% Silica Flume + additives.
๐Ÿ“„ Cementing section
Detailed additive mix for high-temperature stability, beyond routine cementing.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Geotechnical and surveying services
Landslide area requires immediate pre-spud geotech and ongoing annual monitoring, creating urgent opportunities for stability assessments.
Frac and completion services
35-stage plug-and-perf on cemented liners signals near-term need for specialized frac vendors post-drilling.
Waste management
Closed-loop cuttings handling during drilling phase offers immediate contracts for environmental services.