| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Geotechnical evaluation report received by NDIC on July 21, 2017, recommending 2H:1V cut slopes due to landslide area instability. ๐ Geotechnical Evaluation Report section Indicates non-standard slope design in landslide-prone area, not typical for routine well pads. |
2017-07-21 | General Oilfield Services |
| Tier 3 |
Quarterly update submitted on December 14, 2015, modifying development plan to include 35-stage frac with plug and perf on cemented liners.โฐ TIME-SENSITIVE ๐ Quarterly Update Q1-2016 Reveals shift from initial MB-only plan to include TF wells with specific completion design, not routine permit data. |
2015-12-14 | Completions / Frac |
| Tier 3 |
Use of closed-loop cuttings handling system, cuttings hauled to Tervita. ๐ Well Plan Summary Specifies non-standard waste management, not typical fresh water drilling. |
Unknown | Mud / Fluids |
| Tier 3 |
Annual monitoring of wellhead positions in landslide area, with Form 4 submissions by August 15 each year.โฐ TIME-SENSITIVE ๐ Monitor Plan for Soil Stabilization Imposes ongoing regulatory compliance not standard for non-landslide wells. |
Relative | General Oilfield Services |
| Tier 3 |
Permit application submitted in Q4 2015 for wells on existing pad, adding to 8-well configuration. ๐ Quarterly Update Q1-2016 Shows consolidation of wells on existing pads to minimize surface disturbance, deviating from original spaced pads. |
Relative | Drilling Rigs |
| Tier 3 |
Specific cementing recipe: Production liner with 1:1:0 Poz:Lafarge Class G + 20% Silica Flour + 8% Silica Flume + additives. ๐ Cementing section Detailed additive mix for high-temperature stability, beyond routine cementing. |
Unknown | General Oilfield Services |