โ† Back to Daily Permits

๐Ÿ›ข๏ธ Outlaw Gap 24-23MBH-A

Burlington Resources Oil & Gas Company LP ยท McKenzie County, ND ยท File #33544 ยท Generated 2026-02-13 11:56

API
33-053-08008-00
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Waiver requested for tubing/packer requirement during completion to allow flowback without production equipment installation.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Notices and Reports on Wells - Form 4 (September 15, 2017)
Non-standard waiver deviates from typical NDAC casing requirements, suggesting urgency in completion to capture early production.
2017-09-15 Regulatory / Permitting
Tier 3 Sidetrack initiated due to encountering Lower Bakken Shale at 16,309' MD during lateral drilling.
๐Ÿ“„ Geologic Summary and Daily Log of Operations
Sidetrack is a non-routine operational response to geological surprise, indicating potential challenges in maintaining planned trajectory in the Middle Bakken.
2017-09-13 Directional Drilling
Tier 3 Test holes dug on location, water found at 11 feet in southeast portion, requiring water string on all wells.
๐Ÿ“„ Email correspondence (May 10, 2017)
Pre-spud groundwater assessment led to modified casing program, non-routine due to aquifer presence and regulatory stipulations.
2017-05-10 General Oilfield Services
Tier 3 Frac stimulation with 29 stages using 10,315,960 lbs proppant, including 302,140 lbs 100 Mesh and 8,123,620 lbs 40/70 White in 225,906 bbls total base fluid.
๐Ÿ“„ Well Specific Stimulations
Large-scale, multi-stage frac with specific proppant blends indicates advanced completion design tailored to Middle Bakken, beyond routine single-stage treatments.
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Cementing and zonal isolation
Halliburton's liner cementing completed in September 2017; upcoming production requires monitoring for cement integrity in high-pressure completions.
Directional drilling and surveying
Surveys finalized in November 2017; potential for adjacent wells on pad needing similar precision services.
Mudlogging and geological monitoring
Services ended at TD in September 2017; operators may seek similar for future pads to avoid sidetracks.
Fracturing and stimulation
Frac completed post-TD; well in producing status, signaling opportunity for post-frac analysis and optimization services.