โ† Back to Daily Permits

๐Ÿ›ข๏ธ MOEN 41-2-5H

Whiting Oil and Gas Corporation ยท Williams County, ND ยท File #34479 ยท Generated 2026-04-14 01:56

API
33-105-04682
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Wet shoe design for production liner to enable economic toe initiation via wireline perforating
๐Ÿ“„ Horizontal Drilling Plan, October 30, 2017
Non-standard wet shoe configuration over-displaces cement to allow wireline access, avoiding more expensive tubing perforating, indicating cost-optimization strategy
2017-10-30 Completions / Frac
Tier 3 Production method changed from flowing to ESP
๐Ÿ“„ Form 4 Sundry Notices and Reports on Wells, February 11, 2019
Non-routine shift to artificial lift indicates declining natural flow, signaling potential for ESP service opportunities and operational adjustments in similar wells
2019-02-01 General Oilfield Services
Tier 3 Request to change Bottom Hole Location (BHL) to 150'FSL & 1225'FEL SESE Sec. 11, adjusting TD to 21,047' MD
๐Ÿ“„ Form 4 Notice of Intent, May 9, 2018
Non-routine BHL change post-permit approval alters wellbore path and TD, revealing operator intent to optimize lateral placement for better reservoir access
2018-05-09 Directional Drilling
Tier 3 Waiver granted for open hole logs based on offsetting well Long 112-1H
๐Ÿ“„ Form 4 Request to Waive Open Hole Logs, December 5, 2017
Non-routine waiver relies on adjacent well data, reducing logging requirements and potentially speeding up operations
2017-12-05 Regulatory / Permitting

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Artificial Lift (ESP)
ESP installation on February 1, 2019, indicates immediate need for lift services to sustain production, with opportunity for vendors to provide timely deployment
Directional Drilling and Surveying
BHL change in May 2018 requires urgent re-surveying and path adjustments, creating short-term opportunities for directional services
Completion Tools (Frac Plugs and Perforating)
Wet shoe design necessitates specialized plugs and wireline perforating, signaling persistent demand for integrated completion technologies in horizontals