โ† Back to Daily Permits

๐Ÿ›ข๏ธ Christine 158-93-9-4-4MBH

Silver Hill Energy Operating, LLC ยท Mountrail County, ND ยท File #35766 ยท Generated 2026-04-21 02:09

API
3306104355
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 3 Waiver approved for open hole logs, citing existing logs on offsetting wellโฐ TIME-SENSITIVE
๐Ÿ“„ WELL SUNDRY FORM - Request for Consideration/Waiver - Open Hole Log Waiver
Non-standard regulatory approval to skip certain logging, relying on nearby well data.
2025-03-13 Regulatory / Permitting
Tier 3 Spud date notification and initial drilling activitiesโฐ TIME-SENSITIVE
๐Ÿ“„ WELL SUNDRY FORM - Notification of Work Performed - Spud Date
Marks the actual start of drilling operations, with specific rig and cementing details.
2025-03-11 Drilling Rigs
Tier 3 Permit renewal for additional year
๐Ÿ“„ WELL SUNDRY FORM - Permit Renewal
Extends the validity of the drilling permit, indicating persistence in project timeline.
2024-11-22 General Oilfield Services
Tier 3 Well name change from CHRISTINE 158-93-9-4-3MBH to CHRISTINE 158-93-9-4-4MBH
๐Ÿ“„ WELL SUNDRY FORM - Well Name Change
Reflects adjustments in well designation, possibly due to spacing or operational refinements.
2024-10-16 General Oilfield Services
Tier 3 Operator change from Liberty Resources Management Company, LLC to Silver Hill Energy Operating, LLC
๐Ÿ“„ NOTICE OF TRANSFER OF OIL AND GAS WELLS FORM 15
Indicates a shift in operational control and potential changes in strategy or execution for the well.
2024-08-21 General Oilfield Services
Tier 3 MWD survey conducted over 10-day periodโฐ TIME-SENSITIVE
๐Ÿ“„ GORDON TECHNOLOGIES MWD SURVEY CERTIFICATION
Detailed directional survey data provided, indicating precise wellbore trajectory in Bakken.
2025-03-11 to 2025-03-21 Directional Drilling

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling and MWD Services
MWD survey scheduled for March 2025; operators can prepare for high-demand period in Bakken play.
Cementing and Casing Services
Cementing activities noted post-spud in March 2025, aligning with drilling progress.