๐Ÿ›ข๏ธ LTM 158-93-10-3-1MBH

Silver Hill Energy Operating, LLC ยท Mountrail County, ND ยท File #35767 ยท Generated 2026-04-21 02:09

API
3306104356
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Proposed solution: set Copperhead ceramic bridge plug at 20,100' to isolate perfs and production outside hardline, enabling frac despite setback violation.โฐ TIME-SENSITIVE
๐Ÿ“„ Letter dated July 2, 2025
Innovative use of bridge plug for isolation in lateral outside setback, allowing completion without redrilling.
2025-07-02 Completions / Frac
Tier 3 Wellbore drilled outside the 1,220' western hardline/setback, calculated at toe to be 1,215' FWL (5' over line) from 20,100' MD to 20,249' MD (TD).
๐Ÿ“„ Letter dated July 2, 2025
Deviation from regulatory setback requirements, requiring corrective action to enable completion.
2025-07-02 Completions / Frac
Tier 3 Implementation of corrective actions: internal review, updated well planning process, additional QA/QC for hardline wells, and drilling procedures to prevent future occurrences.
๐Ÿ“„ Letter dated July 2, 2025
Non-standard operational changes post-incident to enhance compliance and planning accuracy.
2025-07-02 General Oilfield Services
Tier 3 Well name change from LTM 158-93-10-3-2MBH to LTM 158-93-10-3-1MBH.
๐Ÿ“„ Sundry form dated 09/05/2024
Administrative change post-permit modification, indicating final well designation.
2024-09-05 General Oilfield Services
Tier 3 Operator change from Liberty Resources Management Company, LLC to Silver Hill Energy Operating, LLC, effective March 20, 2024.
๐Ÿ“„ Notice of Transfer dated March 21, 2024
Asset transfer involving 183 wells, shifting operational control.
2024-03-20 General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Bridge plug setting and isolation services
Urgent need in July 2025 to enable frac in August 2025; competitors may see increased demand for ceramic plugs in setback corrections.
Frac scheduling and completions
Tentative frac in middle of August 2025 post-bridge plug; signals timing for pressure pumping and related services.
Directional drilling and surveying
MWD survey completed March-April 2025; post-drilling analysis may reveal anti-collision or trajectory adjustments for future wells.