๐Ÿ›ข๏ธ Shorthorn 3-27 2TFH

Zavanna Energy Operating, LLC ยท Williams County, ND ยท File #37433 ยท Generated 2026-09-25 03:19

API
3310505430
Target Formation
Three Forks
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Spud notification shows drilling contractor Nabors and rig X-28 were used, with contact information for Kraken Oil & Gas.โฐ TIME-SENSITIVE
๐Ÿ“„ Spud Notification within file
Provides specific, time-bound contractor and rig information for the drilling phase.
2026-08-24 Drilling Rigs
Tier 3 Operator requested and received approval to replace visual inspection of top intermediate casing joint and wellhead flange with wireline logging solution.
๐Ÿ“„ Sundry Form ID 330351
This is a non-routine regulatory waiver request to use a quantitative wireline method (caliper logs) instead of a visual inspection, citing safety and data quality.
2026-08-05 Regulatory / Permitting
Tier 3 Operator requested and received approval for a directional survey frequency waiver from 30' to 45' increments if using 45' drill pipe.
๐Ÿ“„ Sundry Form ID 330348
Indicates a planned deviation from standard survey practices, suggesting specific drilling equipment and procedures.
2026-08-05 Directional Drilling
Tier 3 Operator requested a waiver for drill cutting sample collection in the vertical portion, citing samples will be collected from the Shorthorn 3-27 1H on the same pad.
๐Ÿ“„ Sundry Form ID 330349
Shows coordinated sampling strategy across a multi-well pad, reducing redundancy for the vertical section.
2026-08-05 Mud / Fluids
Tier 3 Operator requested and received approval to expand the existing pad for a larger rig size and facilities move.
๐Ÿ“„ Sundry Form ID 315814
Pad expansion for a larger rig indicates a change in drilling program scale and equipment requirements.
2026-05-26 Drilling Rigs

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Wireline Logging (Casing Evaluation)
The approved waiver specifically mandates a wireline logging solution (caliper logs) for evaluating the top intermediate casing joint and surface equipment, creating a direct service requirement.
Directional Drilling / MWD Services
The approved survey frequency waiver indicates specific drilling pipe and survey practices. The well was just spudded, so directional services are actively needed.
Earthwork / Civil Construction
The pad expansion for a larger rig was approved in May 2026, indicating recent or pending grading, excavation, and construction work.
Waste Management / Solids & Liquids Disposal
The identified contractors IHD Solids and IHD Liquids Management are designated for cuttings and mud disposal from the drilling operation, which is currently active.