โ† Back to Daily Permits

๐Ÿ›ข๏ธ Shorthorn 3-27 4TFH

Zavanna Energy Operating, LLC ยท Williams County, ND ยท File #37435 ยท Generated 2026-10-14 06:15

API
3310505432
Target Formation
Three Forks
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Spud notification indicates drilling rig Nabors X28 spudded the well on August 21, 2026.โฐ TIME-SENSITIVE
๐Ÿ“„ Spud Notification / Sundry Form (Notification of Work Performed)
Provides exact spud date and identifies the drilling rig contractor, confirming the start of drilling operations.
2026-08-21 Drilling Rigs
Tier 3 Operator requested and received a waiver to replace visual inspection of top intermediate casing joint and wellhead flange with wireline logging solution, citing superior quantitative data and reduced risk.
๐Ÿ“„ Sundry Form (Request for Variance/Waiver), FORM ID: 330398
Demonstrates a non-routine operational preference for advanced diagnostic tools over standard regulatory visual checks, indicating a reliance on specific wireline services.
2026-08-11 Regulatory / Permitting
Tier 3 Operator requested and received a waiver for drill cutting samples in the vertical portion, relying on samples from a sister well (Shorthorn 3-27 1H) on the same pad.
๐Ÿ“„ Sundry Form (Drill Cutting Samples Waiver), FORM ID: 330397
Shows pad-scale operational planning to streamline sample collection, reducing redundancy and potentially altering service requirements for mud logging or sample handling on this specific well.
2026-08-10 Mud / Fluids
Tier 3 Operator requested and received approval to expand the existing pad to accommodate a larger rig size and facilities move, with detailed engineering plans submitted.
๐Ÿ“„ Sundry Form (Request to Perform Work), FORM ID: 315821
Signals a pre-spud infrastructure investment and a change in rig specifications, indicating upcoming activity requiring larger equipment and site construction services.
2026-05-26 Drilling Rigs
Tier 3 Operator requested and received a waiver for onsite filter sock handling containers, using centralized third-party bins at SWD facilities instead.
๐Ÿ“„ Sundry Form (Filter Sock Container Waiver), FORM ID: 268263
Reveals a company-wide waste management strategy that centralizes filter sock disposal, eliminating a routine on-site service requirement for individual wells.
2025-09-09 Regulatory / Permitting

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Wireline Logging (Casing Evaluation)
Operator's approved waiver specifically mandates wireline logging (caliper) as a replacement for visual inspection, creating a defined service requirement post-drilling.
Pad Construction & Earthmoving
Pad expansion was approved in May 2026 for a larger rig, indicating recent or imminent need for construction services prior to the August 2026 spud.
Directional Drilling / MWD Services
Well has a detailed directional plan; spud has occurred, so directional drilling and survey services are actively underway or recently completed.
Waste Management / Solids & Liquids Hauling
Specific offsite disposal vendors (IHD) are named for cuttings and mud; these services are required during and immediately after drilling.