| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Spud notification indicates drilling rig Nabors X28 spudded the well on August 21, 2026.โฐ TIME-SENSITIVE ๐ Spud Notification / Sundry Form (Notification of Work Performed) Provides exact spud date and identifies the drilling rig contractor, confirming the start of drilling operations. |
2026-08-21 | Drilling Rigs |
| Tier 3 |
Operator requested and received a waiver to replace visual inspection of top intermediate casing joint and wellhead flange with wireline logging solution, citing superior quantitative data and reduced risk. ๐ Sundry Form (Request for Variance/Waiver), FORM ID: 330398 Demonstrates a non-routine operational preference for advanced diagnostic tools over standard regulatory visual checks, indicating a reliance on specific wireline services. |
2026-08-11 | Regulatory / Permitting |
| Tier 3 |
Operator requested and received a waiver for drill cutting samples in the vertical portion, relying on samples from a sister well (Shorthorn 3-27 1H) on the same pad. ๐ Sundry Form (Drill Cutting Samples Waiver), FORM ID: 330397 Shows pad-scale operational planning to streamline sample collection, reducing redundancy and potentially altering service requirements for mud logging or sample handling on this specific well. |
2026-08-10 | Mud / Fluids |
| Tier 3 |
Operator requested and received approval to expand the existing pad to accommodate a larger rig size and facilities move, with detailed engineering plans submitted. ๐ Sundry Form (Request to Perform Work), FORM ID: 315821 Signals a pre-spud infrastructure investment and a change in rig specifications, indicating upcoming activity requiring larger equipment and site construction services. |
2026-05-26 | Drilling Rigs |
| Tier 3 |
Operator requested and received a waiver for onsite filter sock handling containers, using centralized third-party bins at SWD facilities instead. ๐ Sundry Form (Filter Sock Container Waiver), FORM ID: 268263 Reveals a company-wide waste management strategy that centralizes filter sock disposal, eliminating a routine on-site service requirement for individual wells. |
2025-09-09 | Regulatory / Permitting |