| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
SWD permit renewal filed by Grayson Mill but approved under new operator Devon post-transferโฐ TIME-SENSITIVE ๐ Sundry forms and approval stamps Regulatory continuity challenge: permit renewal initiated by Grayson Mill (05/23/2024) but final approval (08/27/2025) granted after operator change to Devon. Shows regulatory lag and transition complexity. |
2025-08-27 | General Oilfield Services |
| Tier 3 |
Large-scale operator change approved - 1,412 wells transferred from Grayson Mill Operating, LLC to Devon Energy Williston, LLC ๐ Form 15 and cover letter Transfer of massive asset portfolio (1,412 wells including SWDs) indicates major corporate realignment or acquisition. Creates immediate service contract re-evaluation opportunity across entire Devon Williston position. |
2024-12-10 | General Oilfield Services |
| Tier 3 |
Tank diking variance approved contingent on as-built schematic submission within 30 days of construction completionโฐ TIME-SENSITIVE ๐ UIC permit stipulations page 2 Non-standard containment requirement with strict 30-day reporting deadline creates compliance urgency. Variance indicates site-specific engineering challenges. |
Relative | General Oilfield Services |
| Tier 3 |
Pressure test requirement (100 psi over permitted max) on injection pipeline between pump and wellhead prior to injectionโฐ TIME-SENSITIVE ๐ UIC permit stipulations page 1 Specific, non-routine testing protocol exceeding standard requirements. Must be reported via Sundry Notice with detailed specifications. |
Relative | General Oilfield Services |
| Tier 3 |
Operator must contact NDIC Field Inspector Jessica Gilkey prior to location constructionโฐ TIME-SENSITIVE ๐ UIC permit stipulations page 1 Named inspector requirement creates specific regulatory pathway and personal relationship dependency. Non-compliance halts operations. |
Relative | General Oilfield Services |