๐Ÿ›ข๏ธ Pearl 148-95-03A-10H

ENERPLUS RESOURCES USA CORPORATION ยท McKenzie County, ND ยท File #39801 ยท Generated 2026-08-21 23:47

API
33-053-10029
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Advanced acoustic imaging (DarkVision HADES) deployed to diagnose casing condition, revealing extensive defects beyond initial breach.
๐Ÿ“„ DarkVision Job Summary dated March 02, 2026
Detailed log showed 17 defective joints, ovality, S-bends, and second breach at 18,146'. Far beyond routine caliper log; indicates severe casing degradation.
2026-03-02 General Oilfield Services
Tier 3 Regulatory abandonment threat issued due to extended shut-in, creating time pressure for remediation.โฐ TIME-SENSITIVE
๐Ÿ“„ Letter from Allen Christensen dated January 24, 2025
NDIC placed well in abandoned-well status with July 24, 2025 deadline to return to production or face bonding requirements. This creates regulatory-driven urgency.
2025-01-24 General Oilfield Services
Tier 3 Major casing integrity failure requiring extensive remediation after initial frac attempt, with hole at 8,647' and widespread wall loss.
๐Ÿ“„ Sundry Form for Well File No.: 39801 - DESCRIPTION (OPERATOR) section
Well was perforated and frac'd Jan 2024 but couldn't pump past 11,400' due to casing breach. This is a major integrity failure requiring complex remediation, not routine wear.
2024-01-24 Completions / Frac
Tier 3 Operator persisted with remediation attempts over 2+ years after initial failure, including multiple fishing attempts and advanced diagnostics.
๐Ÿ“„ Sundry Form for Well File No.: 39801 - DESCRIPTION (OPERATOR) section
Timeline shows: Jan 2024 initial failure, Dec 2025 coil fishing attempt, Feb 2026 WO rig fishing, March 2026 DarkVision log. Operator invested significant time/resources to salvage well.
Relative Drilling Rigs
Tier 3 Remediation plan escalated from casing patch (Jan 2024) to full liner installation (March 2026).
๐Ÿ“„ Comparison of Sundry Forms: Jan 2024 vs March 2026
Initial plan was Enventure casing patch. Final plan is 3-1/2" liner from 8,500' to 21,300' with cement and pressure testing. Escalation indicates patch was insufficient or failed.
Relative Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Fishing & Milling
Multiple fish in hole (RBPs, mill parts). Ongoing need for specialized fishing services.
Liner Running & Cementing
Approved plan to run 3-1/2" liner from 8,500' to 21,300' with full cement job. Major tubular installation opportunity.
Pressure Testing & Well Integrity
Multiple pressure tests required: liner top, casing, frac string. Specialized testing services needed.
Coiled Tubing
Previous unsuccessful coil fishing attempt (Dec 2025) suggests potential for additional coil work.
Workover Rig
WO rig used Feb 2026 for fishing. Likely needed for liner installation and final completion.