โ† Back to Daily Permits

๐Ÿ›ข๏ธ Avalanche 161-93-16-4-3TFHX

Silver Hill Energy Operating, LLC ยท Burke County, ND ยท File #40420 ยท Generated 2026-11-06 03:26

API
3301301935
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 3 Operator formally requested and received approval for an open-hole log waiver, relying on offset well data.
๐Ÿ“„ SUNDRY FORM FOR WELL FILE NO.: 40420 FORM ID: 344369
Regulatory-approved deviation from standard logging rules reduces upfront data acquisition but mandates specific substitute logs (GR-CBL, CBL).
2026-10-23 Regulatory / Permitting
Tier 3 Significant APD modification: changes to surface hole location, kick-off point, lateral length, casing design, cementing stage, and completion intervals.โฐ TIME-SENSITIVE
๐Ÿ“„ PROPOSED WORK section
Multiple design changes from a previous permit indicate active engineering refinement just before planned spud, creating specific service requirements.
2026-10-21 Directional Drilling
Tier 3 Operator submitted a formal statement of completion plans to avoid offsetting wells, listing offsets and committing to 21-31 day notice for stimulation.โฐ TIME-SENSITIVE
๐Ÿ“„ Letter dated September 16, 2026
Formalizes the upcoming completion phase and indicates a pad-level frac campaign is being organized.
2026-09-16 Completions / Frac
Tier 3 The APD was renewed twice (Jan 2025, Jan 2026) before a major modification in Oct 2026, indicating a long-held, active drilling intent.
๐Ÿ“„ Permit renewal sundry forms (Form IDs 288506, 224367)
Demonstrates sustained operator interest and capital allocation planning over years, with the project moving forward after permit renewals.
2026-01-02 General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Surveying
A detailed directional plan exists with specific targets and anti-collision checks; the signed rig contract and estimated spud date (Oct 10, 2026) indicate imminent execution.
Cementing & Completions Engineering
The APD modification changed the production liner to a single cement stage and specifies a 'wet shoe' design for the lateral, requiring precise cementing services.
Cased-Hole Logging
The approved log waiver requires a GR-CBL from TD to ground level and a CBL from KOP to surface, creating a definite logging program.
Drilling Waste Hauling
Operator statements specify a closed-loop system and name primary and secondary disposal sites (Prairie Disposal, Indian Hills Disposal), indicating need for hauling contracts.