← Back to Daily Permits

🛢️ OLSON 147-97-34-27-7H

ENERPLUS RESOURCES USA CORPORATION · Dunn County, ND · File #40765 · Generated 2026-02-06 17:15

API
3302504893
Target Formation
Three Forks First Bench (B1)
Confidence
High

📊 Signals

Tier Signal Date Service Impact
Tier 2 Change in completion method to 'wet shoe' configuration, over-displacing cement by 7 barrels to create uncemented annulus for wireline perforating.
WELL SUNDRY FORM FILE NUMBER: 40765 FORM ID: 198806
2025-03-26 Completions / Frac
Tier 3 First production reported on 6/28/25, with confidential status change effective 12/28/2025.
WELL SUNDRY FORM FILE NUMBER: 40765 FORM ID: 256427
2025-07-01 General Oilfield Services
Tier 3 Request for suspension of drilling operations for up to 90 days using a smaller rig for surface casing before moving to a larger rig for total depth drilling.⏱ URGENT
WELL SUNDRY FORM FILE NUMBER: 40765 FORM ID: 198633
2024-10-16 Drilling Rigs
Tier 3 Waiver requested for open hole logs, proposing Gamma Ray log from KOP to surface, cement bond log on 7" casing, and mud log instead of full open hole suite.
WELL SUNDRY FORM FILE NUMBER: 40765 FORM ID: 198493
2024-07-24 Mud / Fluids
Tier 3 Waiver for directional survey frequency, using 5-inch Range III drill pipe with surveys every 100 feet in vertical, minimum every 45 feet in curve, and every 90 feet in lateral.
WELL SUNDRY FORM FILE NUMBER: 40765 FORM ID: 198545
2024-07-24 Directional Drilling
Tier 3 Waiver for drill cutting samples in vertical portion, proposing to collect samples only on the first well drilled on the pad (OLSON 147-97-34-27-9H-ELL).
WELL SUNDRY FORM FILE NUMBER: 40765 FORM ID: 198538
2024-07-24 Regulatory / Permitting
Tier 3 Permits suspended due to Burlington Resources Oil & Gas Company LP requesting revocation of six 'Olson' permits, including this well.⏱ URGENT
Letter from NDIC dated June 20, 2024
2024-06-20 General Oilfield Services

🎯 Operator Intent

🔧 Service Relevance

Directional drilling and surveying services
Waiver for survey frequency approved in July 2024, with drilling starting July 2024, indicating immediate need for services accommodating specific pipe and interval requirements.
Logging and sampling services
Waivers for open hole logs and samples approved in July 2024, with drilling underway, creating opportunities for alternative logging and sample analysis providers.
Midstream and transportation services
Gas capture plan targets April 2024 completion, but with production in June 2025, ongoing need for pipeline expansion and flaring reduction strategies.
Completion and cementing services
Wet shoe configuration approved in March 2025, with completion in June 2025, signaling demand for specialized toe initiation and cementing techniques.