🛢️ OLSON 147-97-34-27-8H

ENERPLUS RESOURCES USA CORPORATION · Dunn County, ND · File #40769 · Generated 2026-02-06 17:15

API
3302504894
Target Formation
Middle Bakken
Confidence
High

📊 Signals

Tier Signal Date Service Impact
Tier 2 Wet shoe configuration with intentional over-displacement of cement by 7 barrels to create uncemented annulus for wireline perforating.
Sundry Form ID: 198807
2025-03-26 Completions / Frac
Tier 3 Suspension of drilling operations for up to 90 days to allow use of smaller rig for surface casing before mobilizing larger rig for total depth drilling.⏱ URGENT
Sundry Form ID: 198637
2024-10-16 Drilling Rigs
Tier 3 Waiver requested for open hole logs, proposing Gamma Ray log from KOP to surface and cement bond log on 7" casing instead of full open hole suite.
Sundry Form ID: 198502
2024-07-24 Regulatory / Permitting
Tier 3 Waiver for directional survey frequency, using 5-inch pipe requiring surveys every 100' vertical, 45' in curve, 90' lateral.
Sundry Form ID: 198546
2024-07-24 Directional Drilling
Tier 3 Waiver for drill cutting samples in vertical portion, collecting at 30' intervals only on first pad well, resuming in lateral.
Sundry Form ID: 198539
2024-07-24 Regulatory / Permitting
Tier 3 Permits suspended due to revocation request by Burlington Resources, with hearing set for July 2024 docket.
NDIC Letter dated June 20, 2024
2024-07-01 General Oilfield Services
Tier 3 Gas capture plan with Oneok Rockies Midstream, estimating 14 MMCFD initial rate, tied to Bear Den Gas Plant.⏱ URGENT
Gas Capture Plan
2024-04-01 General Oilfield Services
Tier 3 No diesel-based compounds in hydraulic stimulation fluids, explicitly stated in wellbore schematic.
Proposed Wellbore Schematic
Unknown Completions / Frac

🎯 Operator Intent

🔧 Service Relevance

Directional drilling and surveying
With waivers on survey frequency, operators can plan for reduced tool runs, but timing aligns with rig mobilization post-suspension on 2024-10-16.
Midstream gas gathering
Gas capture plan effective April 2024, with expansion underway, creating opportunities for tie-ins before production starts June 2025.
Completion and stimulation
32-stage frac on 2025-06-11 to 2025-06-19, with wet shoe design, signals immediate need for wireline and frac services post-completion.