๐Ÿ›ข๏ธ OAKLAND 154-89-20-29H-1

HUNT OIL COMPANY ยท Mountrail County, ND ยท File #40891 ยท Generated 2026-08-21 23:50

API
3306105360
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Operator requests waiver to flow well up 7'' casing post-frac without tubing/packer, citing casing integrity and monitoring plan.
๐Ÿ“„ WELL SUNDRY FORM - Request for Consideration/Waiver
Non-standard completion design that bypasses conventional tubing/packer installation, indicating a cost/time-saving operational approach with specific casing integrity justifications.
2026-07-16 Completions / Frac
Tier 3 Operator discloses a pattern of surface hole location errors requiring multiple permit amendments (75' then 50' east shifts) due to internal communication failures.
๐Ÿ“„ Letter to Todd Holweger dated September 19, 2025
Reveals operator's internal project management breakdowns leading to regulatory non-compliance, requiring corrective filings and admitting need for improved tracking.
2025-09-19 General Oilfield Services
Tier 3 Operator uses a two-rig strategy: spuds with T&S 2 Spudder rig for surface hole, then suspends drilling for up to 90 days before bringing larger Nabors B21 rig to TD.โฐ TIME-SENSITIVE
๐Ÿ“„ Suspension of Drilling Sundry (FORM ID: 260522)
Non-routine drilling sequence designed for cost/time savings, creating a defined window for rig mobilization and service transition.
2025-07-29 Drilling Rigs
Tier 3 Permit includes explicit stipulation prohibiting deviation in surface hole due to 'possibility of severe casing wear' during vertical/curve drilling.
๐Ÿ“„ Permit Modification (Date: 7/29/2025) - Stipulations
Unusual regulatory condition highlighting operator's specific drilling concerns or past issues, imposing strict directional control.
2025-07-29 Directional Drilling
Tier 3 Production liner shoe is fully cemented with 'no ability to frac out the shoe', explicitly stated in multiple drilling plans.
๐Ÿ“„ Drilling Plan / 'THE PRODUCTION LINER SHOE WILL BE FULLY CEMENTED...'
Specific completion design constraint that eliminates contingency for shoe fracturing, affecting stimulation design and risk profile.
Relative Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Flowback & Production Testing
Waiver for casing flowback creates immediate need for specialized flowback services and pressure monitoring equipment during post-frac operations.
Directional Drilling & Surveying
Multiple permit amendments due to location errors and strict 'no deviation' stipulation indicate heightened need for precise surveying and directional control services.
Drilling Rig Mobilization
Defined 90-day suspension window between spudder rig and Nabors B21 rig creates predictable timing for rig moves and associated services.
Regulatory & Permitting Support
Operator's admitted internal communication failures leading to permit errors signal potential demand for third-party permitting and compliance oversight services.