| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Waiver requested to flow well up 7" casing post-frac without tubing/packer, citing casing integrity and monitoring ๐ WELL SUNDRY FORM - Request for Consideration/Waiver Non-standard completion design; operator plans to flow up casing, relying on casing burst rating and real-time pressure monitoring. Indicates cost-saving or operational flexibility intent, but introduces different risk profile. |
2026-07-16 | Completions / Frac |
| Tier 2 |
Suspension of Drilling (SOD) strategy: spud with small rig (T&S Drilling Rig #1), set surface casing, then bring larger rig (NABORS B21) within 90 daysโฐ TIME-SENSITIVE ๐ WELL SUNDRY FORM - Suspension of Drilling Two-rig strategy to save cost/time. Specific rigs named and timeline given (spud 8/5/2025, big rig by 9/24/2025). Creates a defined window for rig and service handoff. |
2025-07-29 | Directional Drilling |
| Tier 3 |
Operator made multiple unpermitted surface hole location shifts (75' then 50' east) due to internal communication failures, discovered post-spud ๐ Letter from Jason Kurek to Todd Holweger dated September 19, 2025 Reveals significant internal operational breakdown: pad/facilities planning changes (Oct 2024) not communicated to regulatory team, leading to drilling at unpermitted locations. Requires retroactive permit amendments and indicates potential compliance issues. |
2025-09-19 | General Oilfield Services |
| Tier 3 |
Open hole log waiver granted based on offset well (Oakland 154-89-20-29H-1) logs, only GR-CBL planned from TD to surface ๐ WELL SUNDRY FORM - Open Hole Log Waiver Reduces logging program scope, relying on nearby well data. Indicates confidence in subsurface predictability and cost-saving on logging services. |
2024-09-04 | Regulatory / Permitting |
| Tier 3 |
Permit requires contact with specific NDIC Field Inspector (Calob Werre) prior to location construction and prior to setting conductor ๐ PERMIT INFORMATION - Conditions of Approval Unusual stipulation to contact a named inspector at two specific milestones. Indicates heightened regulatory oversight or site-specific concerns. |
Unknown | General Oilfield Services |
| Tier 3 |
Production liner shoe fully cemented with 'no ability to frac out the shoe' - explicitly stated in multiple design summaries ๐ PROPOSED WORK / Cement Program Overview Unusual design constraint. Most operators retain ability to frac out of shoe for contingency. This is a deliberate, restrictive design choice. |
Unknown | Completions / Frac |