โ† Back to Daily Permits

๐Ÿ›ข๏ธ Gullikson 5203 42-31 4B

Chord Energy ยท McKenzie County, ND ยท File #41129 ยท Generated 2026-02-24 18:08

API
33-053-10372
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Wet shoe liner configuration with intentional over-displacement by 7 barrels to create uncemented annulus for economic toe initiation via wireline perforating
๐Ÿ“„ Full Well Details, Wet Shoe discussion
Non-traditional cementing technique to enable cost-effective completion without tubing-conveyed perforating
Unknown Completions / Frac
Tier 3 Request for waiver of open hole logs, citing offsetting well Dobias State Unit 1 within 1 mile for formation tops, with GR-CBL planned from TD to ground level
๐Ÿ“„ Sundry Form for Well File No. 41129, Request for Consideration/Waiver
Non-standard logging approach to reduce costs by relying on nearby well data, potentially indicating operator's cost-saving strategy in mature field
2024-09-16 Regulatory / Permitting
Tier 3 Drill-back notification to adjacent operator Zavanna LLC for wellbore path crossing into 151N 103W Secs 6,5,4, in compliance with NDIC Order No. 31848โฐ TIME-SENSITIVE
๐Ÿ“„ AFFIDAVIT AFFIRMING DRILL BACK NOTIFICATION, email dated July 30, 2024
Explicit intent to drill into adjacent unit, requiring coordination and potentially altering spacing or unit boundaries
2024-07-30 General Oilfield Services
Tier 3 No use of diesel-based stimulation fluids, explicitly stating no compounds with CAS numbers 68334-30-5, 68476-34-6, etc.
๐Ÿ“„ DIESEL BASED STIMULATION FLUIDS/COMPOUNDS section
Regulatory compliance choice avoiding diesel, potentially due to environmental or cost factors in ND
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and surveying
Spud imminent in March 2025 with end in April 2025; Taktikal Directional pre-selected, opportunity for MWD and survey services
Cementing and liner services
Wet shoe design requires precise cement over-displacement; timing aligns with drilling schedule for specialized liner installation
Stimulation fluids
Explicit avoidance of diesel-based fluids; upcoming completion in 2025 creates demand for alternative, environmentally compliant fluids