โ† Back to Daily Permits

๐Ÿ›ข๏ธ Dobias 5203 44-32 2B

Whiting Oil and Gas Corporation ยท McKenzie County, ND ยท File #41158 ยท Generated 2026-02-24 18:08

API
3305310386
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 3 Landowner name correction from Jane G. Munson to Jane G. Monson
๐Ÿ“„ Sundry Form for Well File No. 41158
Post-spud administrative fix, possible surface rights implications
2025-05-27 Drilling Rigs
Tier 3 Two trips in the lateral section due to RSS tool failures, switching to traditional assembly for TD
๐Ÿ“„ Geological Summary and Sample Descriptions
Indicates operational challenges with directional tools, potentially impacting drilling efficiency and costs
2025-05-21 Directional Drilling
Tier 3 Drilled out of casing shoe at 1316 hrs CDT on May 19, 2025โฐ TIME-SENSITIVE
๐Ÿ“„ Geological Summary
Non-standard timing for casing operations in horizontal drilling
2025-05-19 General Oilfield Services
Tier 3 Pad name correction from Dobias 5203 44-32 Pad to include anti-collision report details
๐Ÿ“„ Sundry Form for Well File No. 41158
Administrative correction indicating initial planning errors
2025-04-28 Directional Drilling
Tier 3 Waiver requested for open hole logs, relying on offset well Lassey-Monson 1 for formation tops
๐Ÿ“„ Sundry Form for Well File No. 41158
Deviation from standard logging requirements, cost-saving measure
2024-11-10 Regulatory / Permitting
Tier 3 Drill-back notification to adjacent operator Zavanna LLC for wellbore path crossing into 151N 103Wโฐ TIME-SENSITIVE
๐Ÿ“„ AFFIDAVIT AFFIRMING DRILL BACK NOTIFICATION
Regulatory compliance for inter-unit drilling, potential for unit disputes
2024-07-30 General Oilfield Services
Tier 3 Wet shoe configuration for production liner, intentionally over-displaced by 7 barrels
๐Ÿ“„ Full Well Details
Non-routine liner installation for economic toe initiation
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling tools and repair
RSS tool failures on May 21 and 22, 2025, indicate immediate need for tool maintenance or replacement services
Completion and fracturing
Well awaiting completion post-TD on May 24, 2025, with wet shoe for toe initiation, signaling upcoming frac operations
Survey and anti-collision
Real-time surveys and anti-collision evaluations during drilling, with corrections noted, for ongoing monitoring