๐Ÿ›ข๏ธ Christine 158-93-9-4-20MBH

Silver Hill Energy Operating, LLC ยท Mountrail County, ND ยท File #41160 ยท Generated 2026-04-21 02:10

API
3306105398
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Waiver granted for open hole logs based on offsetting well EN-RITZKE-158-93-1522H-1 within a mile, requiring GR-CBL from TD to ground level and CBL from KOP to surface, with mud logs submitted if run.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form for Well File No.: 41160 - Request for Consideration/Waiver
Non-standard regulatory approval bypassing routine open hole logging requirements, citing proximity to existing logged well.
2025-03-13 Mud / Fluids
Tier 3 Spud date notification: Spud on 3/10/2025, drilled to 2530', run 9 5/8" 36# J-55 BTC casing to 2515', cemented with American Cementing (261 Bbls 11.5# lead & 68 Bbls 13# tail, 96 Bbls to surface).
๐Ÿ“„ Sundry Form for Well File No.: 41160 - Notification of Work Performed
Detailed early drilling operations including specific cement volumes and casing specs.
2025-03-10 Drilling Rigs
Tier 3 MWD surveys conducted from March 10, 2025 through March 31, 2025, with minimum curvature calculation and true north reference.โฐ TIME-SENSITIVE
๐Ÿ“„ MWD Survey Certification and Directional Survey Report
Specific MWD tool usage over extended period, including multiple runs (MWD Run 1 through MWD Run 7).
2025-03-10 General Oilfield Services
Tier 3 Drill-back into adjacent spacing unit 158-93-15, with waiver from NDIC Order No. 31848 as operator controls both units.
๐Ÿ“„ Drill-Back Offset Operator Notification - NDIC Order No. 31848
Uncommon lateral extension into adjacent unit, requiring specific notifications and waivers.
2024-09-06 Regulatory / Permitting
Tier 3 Use of closed-loop drilling system with no cuttings pit, cuttings hauled to approved disposal sites (Prairie Disposal, Inc. primary).
๐Ÿ“„ Operator Statements for NDIC APD - Closed-Loop/"No Pit"
Deviation from traditional open-pit systems, mandated for environmental compliance.
Unknown Mud / Fluids

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

MWD and Directional Surveying
Active during drilling phase from March 10-31, 2025; opportunities for real-time data services to ensure precise lateral placement.
Cementing and Casing
Required immediately post-spud on March 10, 2025, for surface casing; timing critical for well integrity.
Waste Disposal and Environmental Services
Ongoing throughout drilling and completion; closed-loop system necessitates hauling services to specified sites.