โ† Back to Daily Permits

๐Ÿ›ข๏ธ BL-Mortenson- 156-95-2234H-3

HESS BAKKEN INVESTMENTS II, LLC ยท Williams County, ND ยท File #41191 ยท Generated 2026-02-27 18:04

API
3310506346
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Request for suspension of drilling operations for up to 90 days to use a smaller rig for surface hole, citing cost and time savings, with intent to move larger rig within 90 days.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Information - Request for Consideration/Waiver - Suspension of Drilling
Non-standard drilling sequence prioritizing cost efficiency over immediate full-depth operations, potentially delaying larger rig mobilization.
2025-09-03 Drilling Rigs
Tier 3 Rig selection: Nabors X24 for drilling operations.โฐ TIME-SENSITIVE
๐Ÿ“„ DRILLING RIG: NaborsX24 HESS
Specific rig assignment, tied to spud date, indicating operational readiness.
2025-06-18 Drilling Rigs
Tier 3 Waiver of open hole logs requirement, justified by proximity to offsetting well B BEAVER LODGE SWD 1 (NDIC# 7954) with sufficient logs, and plan for GR-CBL from TD to ground.
๐Ÿ“„ Sundry Information - Open Hole Log Waiver
Deviation from standard logging protocols by relying on nearby well data, reducing logging costs.
2024-10-02 Regulatory / Permitting
Tier 3 Selection of Halliburton FIDELIS stage cementer for production liner cementing.
๐Ÿ“„ HALLIBURTON CMTR,FIDELIS,7 BLNK T&C FLUSH 26-32 PPF,P110
Explicit choice of Halliburton equipment for cementing operations, indicating pre-selected contractor.
Unknown General Oilfield Services
Tier 3 Use of TAM International LONGCAP VALVE COLLAR (P-110 HC, 32 ppf) as an inflatable packer for contingency in areas with potential losses through Madison Group due to depletion.
๐Ÿ“„ Contingency Design Proposal (Tioga and Beaver Lodge)
Specific selection of advanced packer technology for loss mitigation, not standard in all wells.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling rigs (smaller and larger)
Suspension allows smaller rig work starting September 2025, with larger rig mobilization within 90 days, creating phased opportunities.
Logging services
Waiver reduces need for open hole logs, but GR-CBL required post-drilling, timing with completion phase.
Cementing and packer services
Pre-selected vendors (TAM, Halliburton) for specific tools, relevant during casing and cementing operations around spud date.