| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Surface casing top job performed on 5/21/25 with 17 bbls cement placed to 32 feet after original cement job. ๐ Sundry Form ID: 250224 Remedial cement work indicates potential issues with initial surface casing cement job. |
2025-05-21 | Drilling Rigs |
| Tier 3 |
Spud date correction from 5/18/2025 to 5/19/2025 @ 18:00, indicating initial reporting error or schedule change. ๐ Sundry Form ID: 248750 Formal correction filed with NDIC, suggesting operational timeline adjustments or reporting compliance issues. |
2025-05-21 | General Oilfield Services |
| Tier 3 |
Mandatory core and sample collection requirement from Top of Madison formation with strict 30-day submission deadline post-drilling.โฐ TIME-SENSITIVE ๐ State Geologist letter dated 2024-10-21 Regulatory requirement with specific collection intervals (30' vertical, 200' horizontal) and tight submission timeline. |
2024-10-21 | General Oilfield Services |
| Tier 3 |
Waiver granted to 3-day waiting period after permit publication, allowing immediate commencement of operations.โฐ TIME-SENSITIVE ๐ Permit stipulations section - 'Waiver to the 3-day waiting period is granted. TLH.' Operator secured expedited start, indicating urgency or tight scheduling constraints. |
2024-10-18 | Regulatory / Permitting |
| Tier 3 |
Confidential status granted for six months from spud date, with all information except production runs remaining confidential.โฐ TIME-SENSITIVE ๐ Permit stipulations section Limits competitor intelligence gathering on this wildcat well for six months post-spud, creating information asymmetry. |
2024-10-18 | General Oilfield Services |
| Tier 3 |
Prohibition on using MTN Poly in surface mud program per NDAC 43-02-03-21 requirement to protect freshwater-bearing strata. ๐ Permit conditions of approval Specific chemical restriction in surface section that deviates from typical mud programs. |
2024-10-18 | Mud / Fluids |