| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Cementing program for production liner specifies a 'wet shoe' design with ability to frac out of the shoe, and no bridge plug between perf and shoe. ๐ GEOLOGIC WELL PROGNOSIS - Completions Information Specific cementing and completion design choice that affects stimulation operations and well integrity management. |
Unknown | Completions / Frac |
| Tier 3 |
Operator requested and received waiver for open hole logs, relying on offset well Sather 1 (NDIC #10424) within a mile, with GR-CBL and CBL logs to be run instead. ๐ WELL SUNDRY FORM - Request for Consideration/Waiver Avoids standard open hole logging requirement, indicating reliance on existing data and potential cost/time savings. Signals operator confidence in subsurface predictability. |
2026-07-01 | Regulatory / Permitting |
| Tier 3 |
Spud notification confirms use of Nabors Rig #B27 (not the originally contracted Nabors B23 mentioned in APD). ๐ WELL SUNDRY FORM - Notification of Work Performed Rig change indicates possible fleet reassignment or operational adjustment; Nabors B23 was originally contracted. |
2026-05-16 | Drilling Rigs |
| Tier 3 |
APD renewal requested on 11/06/2025, extending permit expiration from 10/30/2025 for an additional year.โฐ TIME-SENSITIVE ๐ WELL SUNDRY FORM - Request to Perform Work (Permit Renewal) Indicates operator intent to delay spudding beyond original permit timeline, suggesting strategic pacing or pad sequencing adjustments. |
2025-11-06 | Drilling Rigs |
| Tier 3 |
Operator submitted a 'Drill-Back Offset Operator Notification' requesting waiver from NDIC Order No. 31973 because the adjacent spacing unit is also operated by Silver Hill. ๐ Drill-Back Offset Operator Notification letter Drill-back into adjacent unit owned by same operator simplifies regulatory process and indicates multi-unit development strategy. |
2024-10-29 | Regulatory / Permitting |
| Tier 3 |
Operator explicitly states they will not run a frac string; a caliper log will be submitted for NDIC approval prior to completions. ๐ GEOLOGIC WELL PROGNOSIS - Intermediate Hole Notes Non-standard completion approach; reliance on caliper log instead of frac string indicates alternative isolation or completion design. |
Unknown | Completions / Frac |