๐Ÿ›ข๏ธ DOUBLE-R PAIGE 158-94-34-33-3MBH

Silver Hill Energy Operating, LLC ยท Mountrail County, ND ยท File #41295 ยท Generated 2026-08-25 04:27

API
3306105426
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 3 Operator requested and received waiver for open hole logs, relying on offset well Sather 1 logs instead
๐Ÿ“„ Sundry Form - Request for Consideration/Waiver
Indicates cost-saving measure and reliance on existing data rather than new logging, reducing vendor opportunity for logging services
2026-07-01 Regulatory / Permitting
Tier 3 APD renewal requested nearly a year before expiration (October 2025), indicating long-term planning despite delayed spudโฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form - Request to Perform Work (Permit Renewal)
Operator proactively maintains permit validity well ahead of deadline, suggesting continued intent to drill
2025-11-06 General Oilfield Services
Tier 3 Drill-back into adjacent spacing unit operated by same company, requesting waiver from NDIC Order 31973 notification requirements
๐Ÿ“„ Letter to NDIC dated October 29, 2024
Operator drilling across unit boundaries within own leasehold, streamlining regulatory process
2024-10-29 Regulatory / Permitting
Tier 3 Operator specifically states 'will not run a frac string' and plans to frac out of shoe with wet shoe completion
๐Ÿ“„ Geologic Well Prognosis - Completions Information
Non-standard completion design that eliminates frac string running service and relies on shoe track for stimulation
Unknown Completions / Frac
Tier 3 Closed-loop drilling system specified with no pit, cuttings hauled to specific disposal sites (Prairie Disposal primary, Indian Hills Disposal secondary)
๐Ÿ“„ Operator Statements for NDIC APD - Closed-Loop / 'No Pit'
Pre-selected waste disposal vendors and commitment to zero-discharge drilling system
Unknown Mud / Fluids
Tier 3 Rig contract explicitly named with Nabors B23 in APD, but actual drilling used RDMO Noble Rig #B27
๐Ÿ“„ APD Proposed Work & Sundry Notification of Work Performed
Rig substitution occurred between planning and execution, indicating schedule or contract changes
Relative Drilling Rigs

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Surveying
Anti-collision planning critical with multiple wells on pad and nearby offsets; detailed separation analysis required
Cementing Services
Complex cementing program with wet shoe design for lateral; American Cementing already established relationship
Waste Management & Disposal
Closed-loop system requires continuous cuttings hauling; pre-selected vendors have ongoing opportunity
Completion Fluids & Stimulation
Wet shoe completion design requires precise fluid displacement and pressure management during fracing
Pad Construction & Earthwork
Multi-well pad with significant earthwork (36,680 cu yds cut); grading and compaction services needed