| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Specific cementing design with 'wet shoe' at production liner to enable 'ability to frac out the shoe' as part of west setback justification. ๐ PERMIT INFORMATION - Stipulations (Bakken Setback Summary Statement) Engineering design choice directly tied to regulatory setback compliance. Intentional non-isolation of shoe track for future frac access. |
2024-10-30 | Completions / Frac |
| Tier 3 |
Operator requested and received waiver for open hole logs, relying on offset well Sather 1 (NDIC #10424) data instead. ๐ WELL SUNDRY FORM - Request for Consideration/Waiver Deviates from standard NDIC Rule 43-02-03-31 requiring porosity/resistivity logs. Indicates operator confidence in existing subsurface data and intent to reduce logging costs/time. |
2026-07-01 | Regulatory / Permitting |
| Tier 3 |
APD renewal requested in November 2025, extending permit expiration from October 30, 2025.โฐ TIME-SENSITIVE ๐ WELL SUNDRY FORM - Request to Perform Work (Permit Renewal) Indicates original permit was nearing expiration without spud, suggesting project delays or strategic timing adjustments. |
2025-11-06 | Drilling Rigs |
| Tier 3 |
Spud notification required to NDIC Field Inspector Robert Stafford (701-946-8204) prior to location construction. ๐ PERMIT INFORMATION - Stipulations (Construction Commencement Notification) Specific inspector named for pre-spud contact, indicating heightened regulatory oversight or location-specific conditions. |
2024-10-30 | General Oilfield Services |
| Tier 3 |
Drill-back into adjacent spacing unit (158-94-35) planned, with waiver requested from NDIC Order 31973 notification requirements because Silver Hill operates both units. ๐ Drill-Back Offset Operator Notification letter Non-standard trajectory crossing unit boundaries. Operator leveraging common ownership to streamline regulatory process. |
2024-10-29 | Directional Drilling |
| Tier 3 |
Closed-loop drilling system specified with no pit; cuttings to be hauled to named disposal sites (Prairie Disposal primary, Indian Hills Disposal secondary, Dishon Disposal tertiary). ๐ Operator Statements for NDIC APD - Closed-Loop / 'No Pit' Explicit waste handling protocol with pre-selected disposal vendors. Eliminates onsite reserve pit. |
Unknown | Mud / Fluids |