๐Ÿ›ข๏ธ DOUBLE-R LEAH 158-94-34-33-4MBH

Silver Hill Energy Operating, LLC ยท Mountrail County, ND ยท File #41296 ยท Generated 2026-08-21 23:56

API
3306105427
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Specific cementing design with 'wet shoe' at production liner to enable 'ability to frac out the shoe' as part of west setback justification.
๐Ÿ“„ PERMIT INFORMATION - Stipulations (Bakken Setback Summary Statement)
Engineering design choice directly tied to regulatory setback compliance. Intentional non-isolation of shoe track for future frac access.
2024-10-30 Completions / Frac
Tier 3 Operator requested and received waiver for open hole logs, relying on offset well Sather 1 (NDIC #10424) data instead.
๐Ÿ“„ WELL SUNDRY FORM - Request for Consideration/Waiver
Deviates from standard NDIC Rule 43-02-03-31 requiring porosity/resistivity logs. Indicates operator confidence in existing subsurface data and intent to reduce logging costs/time.
2026-07-01 Regulatory / Permitting
Tier 3 APD renewal requested in November 2025, extending permit expiration from October 30, 2025.โฐ TIME-SENSITIVE
๐Ÿ“„ WELL SUNDRY FORM - Request to Perform Work (Permit Renewal)
Indicates original permit was nearing expiration without spud, suggesting project delays or strategic timing adjustments.
2025-11-06 Drilling Rigs
Tier 3 Spud notification required to NDIC Field Inspector Robert Stafford (701-946-8204) prior to location construction.
๐Ÿ“„ PERMIT INFORMATION - Stipulations (Construction Commencement Notification)
Specific inspector named for pre-spud contact, indicating heightened regulatory oversight or location-specific conditions.
2024-10-30 General Oilfield Services
Tier 3 Drill-back into adjacent spacing unit (158-94-35) planned, with waiver requested from NDIC Order 31973 notification requirements because Silver Hill operates both units.
๐Ÿ“„ Drill-Back Offset Operator Notification letter
Non-standard trajectory crossing unit boundaries. Operator leveraging common ownership to streamline regulatory process.
2024-10-29 Directional Drilling
Tier 3 Closed-loop drilling system specified with no pit; cuttings to be hauled to named disposal sites (Prairie Disposal primary, Indian Hills Disposal secondary, Dishon Disposal tertiary).
๐Ÿ“„ Operator Statements for NDIC APD - Closed-Loop / 'No Pit'
Explicit waste handling protocol with pre-selected disposal vendors. Eliminates onsite reserve pit.
Unknown Mud / Fluids

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Surveying
Complex well path with drill-back into adjacent unit, precise anti-collision requirements with nearby wells, and specific survey frequency mandates. High precision needed.
Cementing
Specific cement design with 'wet shoe' for future frac access. Surface casing job already awarded to American Cementing, but production liner cementing opportunity may exist.
Waste Hauling & Disposal
Closed-loop system with no pit creates continuous need for cuttings hauling to named disposal facilities (Prairie, Indian Hills, Dishon).
Pad Construction & Earthwork
New 3-well pad requiring ~30,820 cu yds cut, 5,860 cu yds fill, and specific compaction requirements. UELS already engaged for design.
Stimulation (Fracing)
Well design allows for 'frac out the shoe'. Operator must notify offset operators 21-31 days before stimulation. Diesel frac fluid explicitly prohibited.