| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Use of specific survey corrections supplier RoundLab and IGRF 2025 model for declination, with survey tool E-9008 positioned 52' from bit. ๐ TAKTIKAL DIRECTIONAL - Survey Corrections Supplier: RoundLab, Model Name: IGRF 2025, Survey Tool & Sensor distance from bit: Survey tool E-9008, Survey 52' from Bit Selection of advanced, non-standard survey technology and corrections for precise navigation in a dense offset environment. |
2025-03-27 | Directional Drilling |
| Tier 3 |
Wellbore trajectory adjusted mid-curve based on gamma markers, with target shifted from 10,626' TVD to 10,632' TVD then to 10,635' TVD. ๐ Geological Summary - Curve section: Target adjusted at Lodgepole top and Middle Bakken top Real-time geological steering adjustments during drilling, demonstrating adaptive operational choices. |
2025-03-23 | General Oilfield Services |
| Tier 3 |
Well spudded and drilled to TD in a condensed timeframe, with directional drilling starting immediately after KOP and curve completed in one day.โฐ TIME-SENSITIVE ๐ Well Summary - Spud Date: 18-Mar-25, KOP: 10,874' MD/March 23, 2025, End of Curve: 11,675' MD/March 24, 2025, TD: 27,090' MD/March 27, 2025 Rapid drilling pace indicates operational efficiency and urgency, with curve build and lateral completed in 9 days total. |
2025-03-18 | Directional Drilling |
| Tier 3 |
Operator requested and received waiver for open hole logs, citing offset well Dobias State Unit 1 within a mile with sufficient open logs to establish formation tops. ๐ SUNDRY FORM FOR WELL FILE NO.: 41358 - Request for Consideration/Waiver - Open Hole Log Waiver Non-standard regulatory choice to forego open hole logging, potentially reducing costs and accelerating operations by relying on offset data. |
2024-11-22 | Regulatory / Permitting |