โ† Back to Daily Permits

๐Ÿ›ข๏ธ CRYING TREE 147-97-8-5-9H-ELL

ENERPLUS RESOURCES USA CORPORATION ยท Dunn County, ND ยท File #41407 ยท Generated 2026-04-24 02:08

API
3302505019
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Spud date with Noble 2 rig.
๐Ÿ“„ Notification of Work Performed Sundry Form
Specific rig assignment for spudding.
2025-11-09 Drilling Rigs
Tier 3 Waiver for collection of drill cutting samples in the vertical portion, resuming at 30' intervals in the curve and lateral sections.
๐Ÿ“„ Drill Cutting Samples Waiver Sundry Form
Deviation from standard 30' interval sampling in vertical section, relying on offsetting well data.
2025-11-04 Regulatory / Permitting
Tier 3 Suspension of drilling operations for up to 90 days using a small freshwater-based rig to set surface casing before bringing in a larger rig to complete drilling.โฐ TIME-SENSITIVE
๐Ÿ“„ Suspension of Drilling Sundry Form
Non-standard drilling sequence to achieve cost and time savings, with specific requirements for casing and cementing.
2025-10-29 Drilling Rigs
Tier 3 Waiver for open hole logs, relying on offsetting well CRYING TREE 8-1H for formation tops, with GR-CBL planned.
๐Ÿ“„ Open Hole Log Waiver Sundry Form
Avoids redundant logging by referencing nearby well data.
2025-08-04 Regulatory / Permitting
Tier 3 Gas capture plan with Oneok Rockies Midstream, including estimated completion date, production rates, and flaring alternatives.โฐ TIME-SENSITIVE
๐Ÿ“„ Gas Capture Plan
Detailed midstream tie-in strategy with specific timelines and rates.
2024-10-10 General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling services
Small rig (Noble 2) for surface hole, with larger rig to follow within 90 days; immediate opportunity for rig mobilization.
Midstream and gathering
Oneok expanding capacity; completion estimated October 2024, creating urgency for pipeline connections.
Waste management
Closed-loop system with vacuum truck to Prairie Disposal; relevant during drilling and completion phases.