๐Ÿ›ข๏ธ Jefferson Federal 5003 42-14 3B

Whiting Petroleum & Gas ยท McKenzie County, ND ยท File #41433 ยท Generated 2026-02-13 11:58

API
3305310459
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Implemented 'wet shoe' liner configuration with intentional over-displacement for toe initiation, avoiding wireline perforating.
๐Ÿ“„ Completion & Perforation Details
Non-standard liner setup optimizes frac operations, reducing complexity and cost compared to traditional methods.
Relative Completions / Frac
Tier 3 Utilized Starsteer software for wellbore steering with 12-foot target window in Middle Bakken, achieving 100% exposure to ideal target.
๐Ÿ“„ Geological Summary - Horizontal Wellbore
Specific software choice for precise targeting implies advanced geosteering capabilities, beyond basic MWD.
2025-10-18 General Oilfield Services
Tier 3 Drilling paused for TOOH at 10,804' MD due to low build rates, resuming after 3 hours, with landing target adjusted downward at Lodgepole marker.โฐ TIME-SENSITIVE
๐Ÿ“„ Geological Summary - Curve Section
Operational adjustment mid-curve suggests real-time steering challenges, not pre-planned, potentially impacting timeline and costs.
2025-10-16 Directional Drilling
Tier 3 Well spudded on a five-well pad, with specific pad construction using existing materials and scoria surfacing, including indirect heater exemption.
๐Ÿ“„ Permit Application and Facility Statement
Pad design emphasizes efficiency and environmental compliance, with multi-well setup indicating batch development intent.
2025-09-14 General Oilfield Services
Tier 3 Operator requested and received waiver for open hole logs, citing sufficient offset well data within 1 mile, allowing GR-CBL run from TD to surface instead.
๐Ÿ“„ Sundry Notice for Open Hole Log Waiver
Non-standard logging approach deviates from typical NDIC requirements, potentially reducing costs and accelerating operations by leveraging offset data.
2025-05-20 Regulatory / Permitting
Tier 3 Anti-collision report shows minimum separation factors as low as 1.913 with adjacent wells, using Chord guidance and gamma ray signatures.
๐Ÿ“„ Anti-Collision Report
Tight spacing on pad requires precise collision avoidance, indicating high-density development strategy.
2023-10-11 Directional Drilling

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Completion and fracturing services
Well reached TD on 2025-10-21 and is awaiting completion, with wet shoe setup indicating immediate need for pump-down perforating and frac initiation.
Geosteering and directional drilling support
Recent drilling adjustments (e.g., TOOH on 2025-10-16) suggest ongoing demand for real-time steering expertise in similar Bakken horizontals.