โ† Back to Daily Permits

๐Ÿ›ข๏ธ Jefferson Federal 5003 42-14 4B

Whiting Petroleum & Gas ยท McKenzie County County, ND ยท File #41434 ยท Generated 2026-02-10 19:17

API
33-053-10460
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Wet shoe configuration with intentional over-displacement of cement by 7 barrels for toe initiation
๐Ÿ“„ Details of Standard Wet Shoe - Jefferson Federal 5003 42-14 4B
Non-standard cementing approach to enable wireline pump-down of perforating guns, avoiding more expensive tubing options
2025-10-12 Completions / Frac
Tier 3 Total drilling days of 10 for 26,733' MD well
๐Ÿ“„ Well Summary - Total Drilling Days
Exceptionally fast drilling pace for horizontal Bakken well, suggesting optimized rig and crew efficiency
2025-10-12 Drilling Rigs
Tier 3 Use of Starsteer software for wellbore steering in lateral section
๐Ÿ“„ Geological Summary - Horizontal Wellbore
Indicates adoption of advanced geosteering technology for precise navigation in Middle Bakken, deviating from standard directional drilling practices
2025-10-09 Directional Drilling
Tier 3 Mud type switch from WBM to OBM at 11,200' MD through curve end
๐Ÿ“„ Well Summary - Mud Type
Specific depth-based fluid change for curve drilling, optimizing for formation conditions
2025-10-07 Mud / Fluids
Tier 3 Waiver granted for open hole logs citing offset well within one mileโฐ TIME-SENSITIVE
๐Ÿ“„ SUNDRY FORM FOR WELL FILE NO.: 41434 FORM ID: 248448
Regulatory choice to skip open hole logging based on proximity to existing logged well, reducing costs and time
2025-05-20 Regulatory / Permitting

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Geosteering and directional drilling services
Drilling completed October 2025; operators can offer post-drilling analysis or tech for upcoming completions
Mud and chemical services
Well awaiting completion; opportunities for fluid optimization or disposal services in Q4 2025
Logging and data services
Waiver granted but GR-CBL planned; providers can bid for cased hole logging upon completion