| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Wet shoe configuration used for toe initiation, allowing wireline perforating without tubing ๐ Details of Standard Wet Shoe Enables cost-effective completion by avoiding more expensive perforating methods |
Unknown | Completions / Frac |
| Tier 3 |
Wellbore traverses adjacent spacing unit, requiring notification to offset operatorโฐ TIME-SENSITIVE ๐ Letter to NDIC re: Jefferson Federal 5003 42-14 2B, 3B, 4B, 5B, 10BX Indicates complex pad layout with inter-unit drilling, not typical for isolated wells |
2025-10-23 | General Oilfield Services |
| Tier 3 |
Waiver requested for open hole logs, citing sufficient offset well logs within 1 mile ๐ WELL SUNDRY FORM for Open Hole Log Waiver Reduces logging costs by leveraging nearby well data, uncommon in standard operations |
2025-05-20 | Regulatory / Permitting |
| Tier 3 |
Anticollision analysis shows minimum separation factors as low as 2.027 with adjacent wells on pad ๐ Anticollision Report Tight spacing on five-well pad requires precise directional control, beyond standard single-well planning |
2023-10-11 | Directional Drilling |