โ† Back to Daily Permits

๐Ÿ›ข๏ธ Jefferson Federal 5003 42-14 5B

Whiting Petroleum & Gas ยท McKenzie County, ND ยท File #41435 ยท Generated 2026-02-05 16:16

API
33-053-10461
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Wet shoe configuration used for toe initiation, allowing wireline perforating without tubing
๐Ÿ“„ Details of Standard Wet Shoe
Enables cost-effective completion by avoiding more expensive perforating methods
Unknown Completions / Frac
Tier 3 Wellbore traverses adjacent spacing unit, requiring notification to offset operatorโฐ TIME-SENSITIVE
๐Ÿ“„ Letter to NDIC re: Jefferson Federal 5003 42-14 2B, 3B, 4B, 5B, 10BX
Indicates complex pad layout with inter-unit drilling, not typical for isolated wells
2025-10-23 General Oilfield Services
Tier 3 Waiver requested for open hole logs, citing sufficient offset well logs within 1 mile
๐Ÿ“„ WELL SUNDRY FORM for Open Hole Log Waiver
Reduces logging costs by leveraging nearby well data, uncommon in standard operations
2025-05-20 Regulatory / Permitting
Tier 3 Anticollision analysis shows minimum separation factors as low as 2.027 with adjacent wells on pad
๐Ÿ“„ Anticollision Report
Tight spacing on five-well pad requires precise directional control, beyond standard single-well planning
2023-10-11 Directional Drilling

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Completion services (perforating, fracturing)
Well reached TD on October 3, 2025, and is awaiting completion; wet shoe design facilitates immediate wireline operations
Directional drilling and MWD services
Tight anticollision margins on pad suggest ongoing need for precise directional control in future wells