| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Wet shoe configuration on production liner, intentionally over-displaced by 7 barrels to create uncemented annulus for economic toe initiation via wireline perforating. ๐ Full Well Details, Discussion Non-standard liner cementing to enable cost-effective completion without tubing or tractor. |
Unknown | Completions / Frac |
| Tier 3 |
Permit renewal request for permit expiring 12/18/2025, with all stipulations and conditions from original permit and modifications to apply.โฐ TIME-SENSITIVE ๐ Sundry Form for Well File No.: 41437, DESCRIPTION (OPERATOR) Renewal implies extension of operational timeline beyond initial permit, with conditions carrying over. |
2026-01-07 | Drilling Rigs |
| Tier 3 |
Request for waiver of open hole logs, justified by offsetting well Winfield Federal 1-23H within a mile with sufficient open logs to establish formation tops, with GR-CBL to be run from TD to ground level. ๐ Sundry Form for Well File No.: 41437, DESCRIPTION (OPERATOR) Waiver deviates from standard logging requirements under NDIC Rule 43-02-03-31, potentially reducing costs by relying on nearby well data. |
2025-05-20 | Regulatory / Permitting |
| Tier 3 |
Anticipated drilling commencement on March 1, 2024, with approximately 30 days for drilling and 10 days for completion.โฐ TIME-SENSITIVE ๐ ANTICIPATED STARTING DATES Specific timeline for operations, indicating planned pace. |
2024-03-01 | Drilling Rigs |