โ† Back to Daily Permits

๐Ÿ›ข๏ธ Jefferson Federal 5003 42-14 7B

WHITING OIL AND GAS CORPORATION ยท McKenzie County, ND ยท File #41437 ยท Generated 2026-03-21 10:24

API
3305310463
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Wet shoe configuration on production liner, intentionally over-displaced by 7 barrels to create uncemented annulus for economic toe initiation via wireline perforating.
๐Ÿ“„ Full Well Details, Discussion
Non-standard liner cementing to enable cost-effective completion without tubing or tractor.
Unknown Completions / Frac
Tier 3 Permit renewal request for permit expiring 12/18/2025, with all stipulations and conditions from original permit and modifications to apply.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form for Well File No.: 41437, DESCRIPTION (OPERATOR)
Renewal implies extension of operational timeline beyond initial permit, with conditions carrying over.
2026-01-07 Drilling Rigs
Tier 3 Request for waiver of open hole logs, justified by offsetting well Winfield Federal 1-23H within a mile with sufficient open logs to establish formation tops, with GR-CBL to be run from TD to ground level.
๐Ÿ“„ Sundry Form for Well File No.: 41437, DESCRIPTION (OPERATOR)
Waiver deviates from standard logging requirements under NDIC Rule 43-02-03-31, potentially reducing costs by relying on nearby well data.
2025-05-20 Regulatory / Permitting
Tier 3 Anticipated drilling commencement on March 1, 2024, with approximately 30 days for drilling and 10 days for completion.โฐ TIME-SENSITIVE
๐Ÿ“„ ANTICIPATED STARTING DATES
Specific timeline for operations, indicating planned pace.
2024-03-01 Drilling Rigs

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and surveying services
Anticipated start March 1, 2024, requires immediate mobilization of crews and equipment for horizontal trajectory.
Regulatory compliance and permitting
Permit renewal expiring 12/18/2025, creating opportunity for extension services ahead of deadline.
Completion and cementing services
Wet shoe design implies need for specialized liner cementing and wireline perforating post-drilling.