| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approved drilling permit includes a 'wet shoe' completion design for the lateral. ๐ Drilling Workbook and Full Well Details Specific engineered completion design (intentional 400' uncemented annulus at toe) dictates specialized cementing and perforating operations. |
2023-10-10 | Completions / Frac |
| Tier 3 |
Approved 90-day suspension of drilling after spudding surface hole with a small rig, requiring a larger rig to move on within 90 days to complete drilling.โฐ TIME-SENSITIVE ๐ Sundry Form ID 324237 Operator is using a two-rig strategy to save costs and time, creating a defined window for a larger drilling rig contractor. |
2026-07-14 | Drilling Rigs |
| Tier 3 |
Permit renewal granted after original expiration, extending operational timeline.โฐ TIME-SENSITIVE ๐ Sundry Form ID 291288 Operator demonstrated persistence in developing this well by successfully renewing an expired permit. |
2026-01-07 | Drilling Rigs |
| Tier 3 |
Waiver granted for open hole logs, relying on offset well data. ๐ Sundry Form ID 248453 Non-routine regulatory approval reduces logging scope, indicating operator confidence in existing subsurface data. |
2025-05-20 | Regulatory / Permitting |
| Tier 3 |
State Geologist mandates collection and submission of drill cuttings and any cores. ๐ Letter from Ross Edison dated 2024-12-30 Regulatory mandate creates a non-discretionary service requirement for sample collection, processing, and shipping. |
2024-12-30 | General Oilfield Services |