๐Ÿ›ข๏ธ Jefferson Federal 5003 42-14 8B

WHITING OIL AND GAS CORPORATION ยท McKenzie County, ND ยท File #41438 ยท Generated 2026-11-23 01:53

API
3305310464
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Approved drilling permit includes a 'wet shoe' completion design for the lateral.
๐Ÿ“„ Drilling Workbook and Full Well Details
Specific engineered completion design (intentional 400' uncemented annulus at toe) dictates specialized cementing and perforating operations.
2023-10-10 Completions / Frac
Tier 3 Approved 90-day suspension of drilling after spudding surface hole with a small rig, requiring a larger rig to move on within 90 days to complete drilling.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form ID 324237
Operator is using a two-rig strategy to save costs and time, creating a defined window for a larger drilling rig contractor.
2026-07-14 Drilling Rigs
Tier 3 Permit renewal granted after original expiration, extending operational timeline.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form ID 291288
Operator demonstrated persistence in developing this well by successfully renewing an expired permit.
2026-01-07 Drilling Rigs
Tier 3 Waiver granted for open hole logs, relying on offset well data.
๐Ÿ“„ Sundry Form ID 248453
Non-routine regulatory approval reduces logging scope, indicating operator confidence in existing subsurface data.
2025-05-20 Regulatory / Permitting
Tier 3 State Geologist mandates collection and submission of drill cuttings and any cores.
๐Ÿ“„ Letter from Ross Edison dated 2024-12-30
Regulatory mandate creates a non-discretionary service requirement for sample collection, processing, and shipping.
2024-12-30 General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling Rig Services
A large drilling rig is contractually required to move onto the location within 90 days of the surface hole spud (by ~11/20/2026 based on 8/20/2026 spud).
Cuttings/Core Handling & Logistics
Mandatory collection and shipment of samples to the state core library within 30 days of drilling completion creates a time-bound service need.
Cementing Services
The approved 'wet shoe' design requires precise cement over-displacement, creating a specialized service opportunity during completion.
Pad Construction & Earthwork
Detailed pad construction plans with specific cut/fill volumes indicate recent or imminent site construction activity.