โ† Back to Daily Permits

๐Ÿ›ข๏ธ Crying Tree 147-97-8-5-3H

Enerplus Resources (USA) Corporation ยท Dunn County, ND ยท File #41470 ยท Generated 2026-04-29 02:31

API
33-025-05023
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Use of wet shoe configuration for production liner, allowing pump-down of first stage perforating guns
๐Ÿ“„ Full Well Details - Wet Shoe Configuration
Non-cemented liner toe for economic toe initiation without tubing or tractor
Relative Completions / Frac
Tier 3 Waiver for collection of drill cutting samples in vertical portion, using samples from offsetting well
๐Ÿ“„ WELL SUNDRY FORM - Request for Consideration/Waiver - Drill Cutting Samples Waiver
Deviation from standard sampling requirements, relying on adjacent well data
2025-11-04 Regulatory / Permitting
Tier 3 Suspension of drilling operations for up to 90 days to use smaller rig for surface hole before larger rig for TDโฐ TIME-SENSITIVE
๐Ÿ“„ WELL SUNDRY FORM - Suspension of Drilling
Non-standard drilling sequence to reduce costs, allowing phased rig deployment
2025-11-03 Drilling Rigs
Tier 3 Waiver for open hole logs, using GR-CBL from TD to surface instead
๐Ÿ“„ WELL SUNDRY FORM - Open Hole Log Waiver
Substitution of logging program to avoid full open hole suite
2025-07-31 Regulatory / Permitting
Tier 3 Commitment to gas capture via pipeline tie-in, with Oneok expansion notedโฐ TIME-SENSITIVE
๐Ÿ“„ Gas Capture Plan
Proactive flaring reduction strategy tied to midstream infrastructure
2024-10-15 General Oilfield Services
Tier 3 No use of diesel-based stimulation fluids, adhering to NDIC restrictions
๐Ÿ“„ Mud and Cementing Plan - DIESEL BASED STIMULATION FLUIDS/COMPOUNDS
Compliance with specific chemical restrictions in stimulation design
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Rig mobilization and drilling services
Phased rig use (small for surface, large for TD) creates sequential opportunities post-November 2025 spud
Mud and cementing services
Specific mud programs (fresh water, invert, brine) and cement designs require tailored supply starting November 2025
Directional and logging services
MWD surveys every 90-100 ft in lateral, plus cased hole logging, align with drilling timeline to TD December 2025
Completion and stimulation services
Plug-and-perf system with 40 stages and no diesel additives positions for post-TD operations in late 2025