โ† Back to Daily Permits

๐Ÿ›ข๏ธ Crying Tree 147-97-8-5-4H

Enerplus Resources (USA) Corporation ยท Dunn County County, ND ยท File #41471 ยท Generated 2026-04-24 02:09

API
33-025-05024
Target Formation
Three Forks
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Wet shoe configuration with intentional over-displacement creating uncemented annulus for frac-out capability
๐Ÿ“„ Full Well Details - Wet Shoe
Alternative to fully cemented shoe, enabling wireline perforating without tubing
Relative Completions / Frac
Tier 3 Waiver for collection of drill cutting samples in vertical portion, using samples from offsetting well
๐Ÿ“„ Sundry Form for Request for Consideration/Waiver - Drill Cutting Samples Waiver
Deviation from standard sample collection requirements, leveraging offsetting well data
2025-11-04 Regulatory / Permitting
Tier 3 Suspension of drilling operations for up to 90 days to use smaller rig for surface hole before larger rig for TDโฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form for Suspension of Drilling
Non-standard drilling sequence to reduce costs, not typical for immediate full TD drilling
2025-10-29 Drilling Rigs
Tier 3 Waiver for open hole logs, planning GR-CBL from TD to surface instead
๐Ÿ“„ Sundry Form for Open Hole Log Waiver
Non-routine logging program, reducing open hole evaluation costs
2025-07-31 Regulatory / Permitting
Tier 3 No use of diesel-based compounds in hydraulic stimulation fluids
๐Ÿ“„ Mud and Cementing Plan - DIESEL BASED STIMULATION FLUIDS/COMPOUNDS
Explicit avoidance of diesel, complying with NDIC rules and potentially environmental preferences
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and MWD services
Active during drilling phase from spud 11/14/2025 to TD 12/29/2025, opportunity for real-time trajectory adjustments
Mud engineering and disposal
Ongoing from spud, with cuttings disposal post-drilling, potential for contracts in similar pad developments
Midstream gas capture
Post-completion, with estimated first production October 2024, urgency for pipeline tie-in to reduce flaring