| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Use of wet shoe configuration for production liner, allowing over-displacement of cement for economic toe initiation ๐ Discussion section in Well Details Alternative to fully cemented shoe, enabling wireline pump-down for first frac stage |
Relative | Completions / Frac |
| Tier 3 |
Waiver for drill cutting samples in vertical portion, collecting only in curve and lateral ๐ Sundry Form for Well File No. 41472 - Request for Consideration/Waiver - Drill Cutting Samples Waiver Deviation from standard sampling requirements, relying on offsetting well data |
2025-11-04 | Regulatory / Permitting |
| Tier 3 |
Suspension of drilling operations for up to 90 days to use smaller rig for surface hole before larger rig for TDโฐ TIME-SENSITIVE ๐ Sundry Form for Well File No. 41472 - Suspension of Drilling Non-standard drilling sequence to reduce costs, with specific conditions on casing and cementing |
2025-10-29 | Drilling Rigs |
| Tier 3 |
Waiver for open hole logs, relying on offsetting well CRYING TREE 8-1H for formation tops ๐ Sundry Form for Well File No. 41472 - Open Hole Log Waiver Non-routine logging approach to avoid redundant data collection |
2025-10-29 | Regulatory / Permitting |