๐Ÿ›ข๏ธ Crying Tree 147-97-8-5-6H

Enerplus Resources (USA) Corporation ยท Dunn County, ND ยท File #41473 ยท Generated 2026-04-29 02:31

API
33-025-05026
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 2 Change in completion method from fully cemented liner to wet shoe configuration allowing frac out, with 150' setback at toe and over-displacement by 7 barrels creating 400' uncemented annulus.
๐Ÿ“„ Sundry Form for Well File No. 41473, Additional Sundry Data; Mud and Cementing Plan; Proposed Wellbore Schematic
Non-standard completion design enabling wireline perforating without tubing or tractor, reducing costs and complexity in tight spacing.
2025-11-17 Completions / Frac
Tier 3 Lateral drilled in 38.48 hours on bottom with average ROP of 350.2 ft/hr, facies breakdown 2.5% B, 65.4% C, 32.1% D, and formation dip averaging 89.83ยฐ.
๐Ÿ“„ Well Information; Days vs. Depth Graph
High-efficiency drilling performance in Middle Bakken, with specific facies targeting indicating optimized geosteering.
2026-01-19 Directional Drilling
Tier 3 Waiver for drill cutting samples in vertical section below curve kickoff, with 30' intervals resuming in curve and 200' in lateral.
๐Ÿ“„ Sundry Form for Well File No. 41473 - Drill Cutting Samples Waiver
Deviation from standard sampling frequency, leveraging offset well data for efficiency in multi-well pad.
2025-11-04 Regulatory / Permitting
Tier 3 Suspension of drilling for up to 90 days to use smaller rig for surface hole, with plug placement to prevent contamination.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form for Well File No. 41473 - Suspension of Drilling
Unusual phased drilling approach to optimize rig utilization and reduce upfront costs in pad development.
2025-10-29 Drilling Rigs
Tier 3 Waiver for open hole logs, relying on offset well CRYING TREE 8-1H within 1 mile, with GR-CBL planned from TD to surface.
๐Ÿ“„ Sundry Form for Well File No. 41473 - Open Hole Log Waiver
Non-routine logging strategy to minimize costs by referencing nearby well data.
2025-07-31 Regulatory / Permitting
Tier 3 Mud program specifies invert diesel in vertical hole (0'-11,653' MD) and brine in horizontal (11,653'-21,896' MD), with closed-loop system and no pit.
๐Ÿ“„ Mud and Cementing Plan
Custom mud system tailored to hole sections, avoiding traditional pits for environmental compliance.
Relative Mud / Fluids
Tier 3 No diesel-based compounds in hydraulic stimulation fluids, with commitment to reduce flaring via sales pipeline tie-in.
๐Ÿ“„ Mud and Cementing Plan; Gas Capture Plan
Environmental compliance measures beyond standard, prioritizing clean stimulation and gas capture.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and MWD services
High-efficiency lateral drilling completed in 38.48 hours; upcoming completions may require similar geosteering for facies targeting.
Mud engineering and disposal
Custom invert-to-brine mud system with closed-loop disposal; potential for brine handling services in horizontal sections.
Wireline perforating and stimulation
Wet shoe enables wireline frac initiation; estimated 40 stages signal immediate opportunity for plug-and-perf services post-TD.
Midstream gas capture
Commitment to sales pipeline tie-in by October 2024; Oneok expansion indicates timing-sensitive partnerships for flaring reduction.