๐Ÿ›ข๏ธ Crying Tree 147-97-8-5-7H

Enerplus Resources (USA) Corporation ยท Dunn County, ND ยท File #41474 ยท Generated 2026-04-24 02:09

API
33-025-05027
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Change in completion method from fully cemented liner to wet shoe configuration allowing frac out at toe
๐Ÿ“„ Sundry Form for Well File No. 41474, Additional Sundry Data
Non-standard completion design enabling toe initiation via wireline without tubing or tractor, reducing costs
2025-11-17 Completions / Frac
Tier 3 Waiver granted for drill cutting samples in vertical section, resuming at curve kickoff
๐Ÿ“„ Sundry Form for Well File No. 41474, Drill Cutting Samples Waiver
Deviation from standard sampling protocol, relying on offset well data
2025-11-04 Regulatory / Permitting
Tier 3 Suspension of drilling approved for up to 90 days to use smaller rig for surface holeโฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form for Well File No. 41474, Suspension of Drilling
Cost-saving strategy by staging rig sizes, avoiding deviation in surface hole
2025-11-03 Drilling Rigs
Tier 3 Waiver for open hole logs, relying on offset well within 1 mile
๐Ÿ“„ Sundry Form for Well File No. 41474, Open Hole Log Waiver
Bypasses standard logging requirements, using nearby well data
2025-07-31 Regulatory / Permitting
Tier 3 Mud program specifies invert diesel in vertical hole, brine in horizontal, with no diesel in stimulation fluids
๐Ÿ“„ Mud Program section
Non-standard mud types and explicit diesel avoidance in frac fluids
Relative Mud / Fluids

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional and MWD services
Pre-selected Total Directional Services for drilling starting November 2025, opportunity for vendors to align with survey frequency requirements
Mud engineering and fluid services
Fort Berthold Services specified for invert diesel and brine programs, timing tied to spud date November 11, 2025
Completion and frac services
Wet shoe configuration approved November 17, 2025, signals immediate need for plug-and-perf systems to avoid costly alternatives