| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Change in completion method from fully cemented liner to wet shoe for frac-out capability ๐ Sundry Notice for Change in Completion Method Modification to enable wireline perforating without tubing, altering standard cementing practices |
2025-11-17 | Completions / Frac |
| Tier 3 |
Waiver requested for drill cutting samples in vertical portion, citing samples from offsetting well ๐ Sundry Notice for Drill Cutting Samples Waiver Deviation from standard sampling requirements to reduce operational costs |
2025-11-04 | Regulatory / Permitting |
| Tier 3 |
Request for suspension of drilling operations for up to 90 days to use smaller rig for surface casingโฐ TIME-SENSITIVE ๐ Sundry Notice for Suspension of Drilling Non-standard drilling sequence allowing cost savings by deferring larger rig mobilization |
2025-10-29 | Drilling Rigs |
| Tier 3 |
Waiver for open hole logs, relying on offsetting well data ๐ Sundry Notice for Open Hole Log Waiver Non-routine logging plan to minimize costs in pad development |
2025-07-31 | Regulatory / Permitting |