โ† Back to Daily Permits

๐Ÿ›ข๏ธ Barbara 31-30F 8TFH

Devon Energy Williston, LLC ยท McKenzie County, ND ยท File #41481 ยท Generated 2026-05-05 02:14

API
33-053-10480
Target Formation
Three Forks
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 2 Waiver for tubing/packer requirement, with assurances on casing design and monitoring
๐Ÿ“„ Sundry Form for Well File No.: 41481 - Tubing/Packer Waiver
Deviation from standard safety requirements for tubing installation
2025-01-20 Regulatory / Permitting
Tier 3 Request for waiver on collection of drill cutting samples in vertical portion, citing use of samples from Barbara 36-25F XW 1H on the same padโฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form for Well File No.: 41481 - Request for Consideration/Waiver
Non-standard waiver for sample collection, leveraging adjacent well on pad to reduce operational redundancy
2026-01-28 Regulatory / Permitting
Tier 3 Switch from diesel invert mud to brine in lateral sectionโฐ TIME-SENSITIVE
๐Ÿ“„ 2. METHODS - Lateral drilling fluid switched to brine
Mud program change mid-drilling for lateral phase
2025-11-10 Mud / Fluids
Tier 3 Suspension of drilling operations for up to 90 days to allow use of smaller rig for surface hole before conventional rigโฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form for Well File No.: 41481 - Suspension of Drilling
Temporary halt in drilling to optimize rig utilization and reduce costs
2025-01-20 Drilling Rigs
Tier 3 Waiver for open hole logs, citing sufficient logs from offsetting well Barbara 36-25F XW 1H
๐Ÿ“„ Sundry Form for Well File No.: 41481 - Open Hole Log Waiver
Reliance on adjacent well data instead of running new logs
2025-01-20 Regulatory / Permitting
Tier 3 Operator transfer from Grayson Mill Operating, LLC to Devon Energy Williston, LLC
๐Ÿ“„ NOTICE OF TRANSFER OF OIL AND GAS WELLS FORM 15
Change in ownership and operation of the well
2024-12-10 General Oilfield Services
Tier 3 Use of wet shoe with ability to frac out the toe in production liner
๐Ÿ“„ PROPOSED DRILLING PLAN - Production Liner details
Non-standard liner design allowing toe fracturing
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling and MWD Services
Well spudded November 5, 2025, with lateral drilling starting November 10, 2025; immediate need for survey and navigation services
Geosteering and Geology
Geosteering active during drilling; TD reached November 13, 2025, signaling post-drilling analysis opportunity
Mud and Completion Services
Mud switch to brine in lateral; completion with wet shoe indicates specialized fluid and liner services needed