| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Waiver for tubing/packer requirement, with assurances on casing design and monitoring ๐ Sundry Form for Well File No.: 41481 - Tubing/Packer Waiver Deviation from standard safety requirements for tubing installation |
2025-01-20 | Regulatory / Permitting |
| Tier 3 |
Request for waiver on collection of drill cutting samples in vertical portion, citing use of samples from Barbara 36-25F XW 1H on the same padโฐ TIME-SENSITIVE ๐ Sundry Form for Well File No.: 41481 - Request for Consideration/Waiver Non-standard waiver for sample collection, leveraging adjacent well on pad to reduce operational redundancy |
2026-01-28 | Regulatory / Permitting |
| Tier 3 |
Switch from diesel invert mud to brine in lateral sectionโฐ TIME-SENSITIVE ๐ 2. METHODS - Lateral drilling fluid switched to brine Mud program change mid-drilling for lateral phase |
2025-11-10 | Mud / Fluids |
| Tier 3 |
Suspension of drilling operations for up to 90 days to allow use of smaller rig for surface hole before conventional rigโฐ TIME-SENSITIVE ๐ Sundry Form for Well File No.: 41481 - Suspension of Drilling Temporary halt in drilling to optimize rig utilization and reduce costs |
2025-01-20 | Drilling Rigs |
| Tier 3 |
Waiver for open hole logs, citing sufficient logs from offsetting well Barbara 36-25F XW 1H ๐ Sundry Form for Well File No.: 41481 - Open Hole Log Waiver Reliance on adjacent well data instead of running new logs |
2025-01-20 | Regulatory / Permitting |
| Tier 3 |
Operator transfer from Grayson Mill Operating, LLC to Devon Energy Williston, LLC ๐ NOTICE OF TRANSFER OF OIL AND GAS WELLS FORM 15 Change in ownership and operation of the well |
2024-12-10 | General Oilfield Services |
| Tier 3 |
Use of wet shoe with ability to frac out the toe in production liner ๐ PROPOSED DRILLING PLAN - Production Liner details Non-standard liner design allowing toe fracturing |
Unknown | Completions / Frac |