โ† Back to Daily Permits

๐Ÿ›ข๏ธ BARBARA 31-30F 4TFH

DEVON ENERGY WILLISTON, L.L.C ยท McKenzie County, ND ยท File #41484 ยท Generated 2026-05-05 02:14

API
33-053-10483
Target Formation
Three Forks
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 1 Waiver for tubing/packer requirement with assurances on safety factors
๐Ÿ“„ Sundry Form for Well File No. 41484, dated January 20, 2025
Variance from standard completion equipment, citing design specifics for pressure management
2025-01-20 Regulatory / Permitting
Tier 3 Waiver for drill cutting samples using existing samples from Barbara 36-25F XW 1H on the same pad
๐Ÿ“„ Sundry Form for Well File No. 41484, dated January 28, 2026
Non-standard regulatory approval to reuse samples from an adjacent well, suggesting pad-level efficiency in sampling protocols
2026-01-28 Regulatory / Permitting
Tier 3 Change of operator from Grayson Mill Operating, LLC to Devon Energy Williston, LLC
๐Ÿ“„ Change of Operator Notice dated October 31, 2025
Indicates a transfer of operational control and bonding, potentially signaling shifts in development strategy or asset management in the Grinnell field
2025-10-31 General Oilfield Services
Tier 3 Suspension of drilling for up to 90 days to allow surface hole drilling with smaller rigโฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form for Well File No. 41484, approved March 6, 2025
Permitted delay in full drilling to optimize rig utilization, indicating phased development approach
2025-03-06 Drilling Rigs
Tier 3 Waiver for filter sock container during drilling phase
๐Ÿ“„ Sundry Form for Well File No. 41484, dated January 20, 2025
Exemption from standard waste containment, based on no filtration use, revealing operator's mud system choices
2025-01-20 Mud / Fluids
Tier 3 Waiver for open hole logs, relying on offsetting well data
๐Ÿ“„ Sundry Form for Well File No. 41484, dated January 20, 2025
Bypassing standard logging in favor of existing data from nearby well, indicating data-sharing efficiencies
2025-01-20 Regulatory / Permitting
Tier 3 Switch from diesel invert to brine mud in lateral section
๐Ÿ“„ Wellsite Geology End of Well Report
Mid-well mud change for formation compatibility, not typical in standard plans
Relative Mud / Fluids

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional and MWD services
Active during curve and lateral drilling phases (September 26-October 3, 2025), with Total Directional as primary MWD provider
Geosteering and geology
Ongoing through drilling completion (October 3, 2025), with Wellcon and Field Geo Services integrated for real-time adjustments
Waste disposal
Required post-drilling for cuttings handling, with Select Energy as designated facility