| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 1 |
Waiver for tubing/packer requirement with assurances on safety factors ๐ Sundry Form for Well File No. 41484, dated January 20, 2025 Variance from standard completion equipment, citing design specifics for pressure management |
2025-01-20 | Regulatory / Permitting |
| Tier 3 |
Waiver for drill cutting samples using existing samples from Barbara 36-25F XW 1H on the same pad ๐ Sundry Form for Well File No. 41484, dated January 28, 2026 Non-standard regulatory approval to reuse samples from an adjacent well, suggesting pad-level efficiency in sampling protocols |
2026-01-28 | Regulatory / Permitting |
| Tier 3 |
Change of operator from Grayson Mill Operating, LLC to Devon Energy Williston, LLC ๐ Change of Operator Notice dated October 31, 2025 Indicates a transfer of operational control and bonding, potentially signaling shifts in development strategy or asset management in the Grinnell field |
2025-10-31 | General Oilfield Services |
| Tier 3 |
Suspension of drilling for up to 90 days to allow surface hole drilling with smaller rigโฐ TIME-SENSITIVE ๐ Sundry Form for Well File No. 41484, approved March 6, 2025 Permitted delay in full drilling to optimize rig utilization, indicating phased development approach |
2025-03-06 | Drilling Rigs |
| Tier 3 |
Waiver for filter sock container during drilling phase ๐ Sundry Form for Well File No. 41484, dated January 20, 2025 Exemption from standard waste containment, based on no filtration use, revealing operator's mud system choices |
2025-01-20 | Mud / Fluids |
| Tier 3 |
Waiver for open hole logs, relying on offsetting well data ๐ Sundry Form for Well File No. 41484, dated January 20, 2025 Bypassing standard logging in favor of existing data from nearby well, indicating data-sharing efficiencies |
2025-01-20 | Regulatory / Permitting |
| Tier 3 |
Switch from diesel invert to brine mud in lateral section ๐ Wellsite Geology End of Well Report Mid-well mud change for formation compatibility, not typical in standard plans |
Relative | Mud / Fluids |