| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Waiver for tubing/packer requirement with assurances on casing design and monitoring ๐ Sundry Form for Well File No.: 41485 Deviation from standard completion safety protocols |
2025-01-20 | Regulatory / Permitting |
| Tier 3 |
Waiver requested for collection of drill cutting samples in vertical portion, utilizing samples from Barbara 36-25F XW 1H on the same pad ๐ Sundry Form for Well File No.: 41485 Non-standard waiver to reduce sampling redundancy on multi-well pad |
2026-01-28 | Regulatory / Permitting |
| Tier 3 |
Actual spud and completion dates: Spud September 15, 2025, TD September 22, 2025 ๐ Wellsite Geology End of Well Report Rapid drilling completion in 7 days |
2025-09-15 | Drilling Rigs |
| Tier 3 |
Spud date reported as July 23, 2025, with suspension for smaller rigโฐ TIME-SENSITIVE ๐ Sundry Form for Well File No.: 41485 Delayed spud due to phased drilling |
2025-07-23 | Drilling Rigs |
| Tier 3 |
Suspension of drilling operations for up to 90 days to allow surface hole drilling with smaller rigโฐ TIME-SENSITIVE ๐ Sundry Form for Well File No.: 41485 Unusual phased drilling approach to optimize rig utilization |
2025-01-20 | Drilling Rigs |
| Tier 3 |
Waiver for filter sock container requirement during drilling phase ๐ Sundry Form for Well File No.: 41485 Exemption from standard waste management protocol |
2025-01-20 | Regulatory / Permitting |
| Tier 3 |
Waiver for open hole logs, relying on offsetting well data ๐ Sundry Form for Well File No.: 41485 Bypassing standard logging requirements |
2025-01-20 | Regulatory / Permitting |
| Tier 3 |
Change of operator from Grayson Mill Operating, LLC to Devon Energy Williston, LLC ๐ NOTICE OF TRANSFER OF OIL AND GAS WELLS FORM 15 Mid-project operator transition |
2024-12-10 | General Oilfield Services |