๐Ÿ›ข๏ธ Barbara 31-30F 3H

Devon Energy ยท McKenzie County, ND ยท File #41485 ยท Generated 2026-04-13 01:37

API
33-053-10484
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (8)

Tier Signal Date Service Impact
Tier 2 Waiver for tubing/packer requirement with assurances on casing design and monitoring
๐Ÿ“„ Sundry Form for Well File No.: 41485
Deviation from standard completion safety protocols
2025-01-20 Regulatory / Permitting
Tier 3 Waiver requested for collection of drill cutting samples in vertical portion, utilizing samples from Barbara 36-25F XW 1H on the same pad
๐Ÿ“„ Sundry Form for Well File No.: 41485
Non-standard waiver to reduce sampling redundancy on multi-well pad
2026-01-28 Regulatory / Permitting
Tier 3 Actual spud and completion dates: Spud September 15, 2025, TD September 22, 2025
๐Ÿ“„ Wellsite Geology End of Well Report
Rapid drilling completion in 7 days
2025-09-15 Drilling Rigs
Tier 3 Spud date reported as July 23, 2025, with suspension for smaller rigโฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form for Well File No.: 41485
Delayed spud due to phased drilling
2025-07-23 Drilling Rigs
Tier 3 Suspension of drilling operations for up to 90 days to allow surface hole drilling with smaller rigโฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form for Well File No.: 41485
Unusual phased drilling approach to optimize rig utilization
2025-01-20 Drilling Rigs
Tier 3 Waiver for filter sock container requirement during drilling phase
๐Ÿ“„ Sundry Form for Well File No.: 41485
Exemption from standard waste management protocol
2025-01-20 Regulatory / Permitting
Tier 3 Waiver for open hole logs, relying on offsetting well data
๐Ÿ“„ Sundry Form for Well File No.: 41485
Bypassing standard logging requirements
2025-01-20 Regulatory / Permitting
Tier 3 Change of operator from Grayson Mill Operating, LLC to Devon Energy Williston, LLC
๐Ÿ“„ NOTICE OF TRANSFER OF OIL AND GAS WELLS FORM 15
Mid-project operator transition
2024-12-10 General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling and MWD
Immediate need for curve and lateral drilling services starting September 2025
Geosteering and Geology
Ongoing during drilling from September 15-22, 2025, for target landing
Rig Services
Rig availability for surface hole (July 2025) and full drilling (September 2025)