โ† Back to Daily Permits

๐Ÿ›ข๏ธ MHA SPLIT 4992 43-20 3BHP

Enerplus Resources USA Corporation ยท Dunn County, ND ยท File #41508 ยท Generated 2026-05-05 02:14

API
3302505035
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (3)

Tier Signal Date Service Impact
Tier 2 Wet shoe configuration with intentional over-displacement of cement to create uncemented annulus for toe initiation, avoiding more expensive perforating options.
๐Ÿ“„ Wet Shoe section, page 11
Cost-saving design choice in liner cementing deviates from standard fully cemented shoes, revealing operator preference for economic toe access in U-turn laterals.
2026-05-04 Completions / Frac
Tier 2 Permit modification to relocate surface hole location, bottom hole location, and change lateral to U-turn shape with toe initiation via wet shoe for fracking out the shoe.โฐ TIME-SENSITIVE
๐Ÿ“„ Proposed Work section, page 8
Non-standard wellbore redesign indicates adaptive strategy to optimize lateral placement and completion in Bakken formation, potentially addressing geological or operational challenges not visible in initial permit.
2026-04-29 Directional Drilling
Tier 3 Waiver requested and granted for diesel-based compounds in hydraulic stimulation fluids, citing no use of specified CAS numbers.
๐Ÿ“„ Diesel Based Stimulation Fluids section, page 9
Explicit commitment to non-diesel fluids in fracking aligns with regulatory trends and environmental preferences, differing from some operators' practices.
2026-05-04 Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling and Surveying
Permit modification approved in May 2026 implies immediate need for trajectory adjustments; service operators should prepare for U-turn lateral drilling in Dunn County.
Cementing and Completion
Wet shoe configuration and liner cementing details signal upcoming operations; vendors with over-displacement expertise are timely for this project.