| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Implementation of wet shoe configuration for toe initiation, with intentional over-displacement of cement by 7 barrels to create uncemented annulus. ๐ Wet Shoe section, Page 11 Wet shoe allows cost-effective wireline perforating for first frac stage, avoiding more expensive tubing or tractor methods, revealing operator preference for economic completion techniques. |
Unknown | Completions / Frac |
| Tier 3 |
Permit modification to change wellbore design from standard lateral to U-turn lateral, extending lateral length to 32640 MD and incorporating frac out toe configuration. ๐ Proposed Work section, Page 8 U-turn lateral design is non-standard and indicates advanced directional drilling to optimize reservoir access, differing from typical straight laterals. |
2026-05-04 | Directional Drilling |
| Tier 3 |
Waiver requested and granted for drill-back policy notification due to operator being the same for adjacent spacing unit. ๐ Letter from Emily Garcia, dated February 7, 2024 Self-waiver for notification in adjacent unit suggests operator consolidation and reduced regulatory hurdles, potentially accelerating project timelines. |
2024-02-07 | Regulatory / Permitting |