๐Ÿ›ข๏ธ MHA DUCKPIN 4992 43-20 4BHP

Enerplus Resources USA Corporation ยท Dunn County, ND ยท File #41509 ยท Generated 2026-05-05 02:15

API
3302505036
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (3)

Tier Signal Date Service Impact
Tier 2 Implementation of wet shoe configuration for toe initiation, with intentional over-displacement of cement by 7 barrels to create uncemented annulus.
๐Ÿ“„ Wet Shoe section, Page 11
Wet shoe allows cost-effective wireline perforating for first frac stage, avoiding more expensive tubing or tractor methods, revealing operator preference for economic completion techniques.
Unknown Completions / Frac
Tier 3 Permit modification to change wellbore design from standard lateral to U-turn lateral, extending lateral length to 32640 MD and incorporating frac out toe configuration.
๐Ÿ“„ Proposed Work section, Page 8
U-turn lateral design is non-standard and indicates advanced directional drilling to optimize reservoir access, differing from typical straight laterals.
2026-05-04 Directional Drilling
Tier 3 Waiver requested and granted for drill-back policy notification due to operator being the same for adjacent spacing unit.
๐Ÿ“„ Letter from Emily Garcia, dated February 7, 2024
Self-waiver for notification in adjacent unit suggests operator consolidation and reduced regulatory hurdles, potentially accelerating project timelines.
2024-02-07 Regulatory / Permitting

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and trajectory services
Permit approved 2026-05-04 with anticipated drilling start June 2025, creating immediate opportunity for U-turn capable rigs and MWD tools.
Completion and perforating services
Wet shoe and frac out toe design signals need for wireline perforating and plug-and-perf systems post-approval.
Cementing and waste disposal
Over-displacement cementing and listed disposal facilities indicate readiness for integrated services upon spud.