← Back to Daily Permits

🛢️ Clifford Bakke 26-35 6TFH

DEVON ENERGY WILLISTON, L.L.C · Mountrail County, ND · File #41529 · Generated 2026-02-06 17:15

API
3306105475
Target Formation
Three Forks First Bench (B1)
Confidence
High

📊 Signals

Tier Signal Date Service Impact
Tier 2 Variance for tubing/packer requirement based on high-burst casing design⏱ URGENT
FORM ID: 237054, Page 1
2025-10-31 General Oilfield Services
Tier 3 Waiver for filter sock container during drilling phase, as operator does not use filter media⏱ URGENT
FORM ID: 237043, Page 1
2025-03-21 Regulatory / Permitting
Tier 3 Suspension of drilling for up to 90 days to use smaller rig initially before larger rig⏱ URGENT
FORM ID: 237048, Page 1
2025-03-19 Drilling Rigs
Tier 3 Waiver for open hole logs, using data from offsetting well within 1 mile
FORM ID: 237016, Page 1
2025-03-18 Regulatory / Permitting
Tier 3 Well name change from Clifford Bakke 25-36 6TFH to Clifford Bakke 26-35 6TFH
FORM ID: 228109, Page 1
2025-02-05 General Oilfield Services
Tier 3 Backbuild Order Waiver for horizontal drilling entering Bakken Petroleum System outside target spacing unit
Letter dated November 25, 2024
2024-11-25 Regulatory / Permitting

🎯 Operator Intent

🔧 Service Relevance

Small rig drilling services
Immediate opportunity starting March 2025 for surface hole drilling with smaller rigs capable of completing in 3-5 days
Large rotary rig services
Scheduled demand within 90 days of surface completion for full TD drilling and casing operations
Casing and cementing monitoring
Required during suspension period with immediate calls after spud and plug bump, plus field inspector notification when large rig moves on