← Back to Daily Permits

🛢️ ORVILLE 4-9 7H

DEVON ENERGY WILLISTON, L.L.C · Williams County, ND · File #41531 · Generated 2026-02-06 17:15

API
3310506410
Target Formation
Middle Bakken
Confidence
High

📊 Signals

Tier Signal Date Service Impact
Tier 2 Variance for tubing/packer requirement with safety assurances
Page 1, DESCRIPTION (OPERATOR) for Form ID 229367
2025-01-30 General Oilfield Services
Tier 3 Suspension of drilling for up to 90 days using small freshwater-based rig first, followed by larger rig⏱ URGENT
Page 1, DESCRIPTION (OPERATOR)
2025-03-07 Drilling Rigs
Tier 3 Waiver for filter sock container during drilling phase
Page 1, DESCRIPTION (OPERATOR) for Form ID 229307
2025-02-05 Regulatory / Permitting
Tier 3 Waiver for open hole logs using offsetting well data
Page 1, DESCRIPTION (OPERATOR) for Form ID 229276
2025-01-30 Regulatory / Permitting
Tier 3 Emergency response plan for well pad operations
Emergency Response Plan
2025-01-02 General Oilfield Services
Tier 3 Backbuild order waiver for multiple off-spacing wells
Letter dated January 2nd, 2024
2024-01-02 Regulatory / Permitting
Tier 3 Proposed pad location with detailed BMPs including road routing and midstream connections
Letter dated January 2nd, 2024
2024-01-02 General Oilfield Services
Tier 3 H2S mitigation plan with training and safety protocols
H2S Mitigation Plan
Unknown General Oilfield Services

🎯 Operator Intent

🔧 Service Relevance

Drilling rigs (small and large)
Phased drilling approach requires sequential rig mobilization starting around June 2025
Waste management and disposal
Drill cuttings disposal at Secure Energy Services landfill during drilling phase
Midstream gas transportation
Produced gas dedicated to ONEOK; immediate opportunity upon production start
H2S safety and training services
Comprehensive H2S mitigation plan requires specialized equipment and personnel training
Emergency response and spill prevention
ERP and SPCC plans necessitate on-site emergency services during operations