| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 | Variance for tubing/packer requirement with safety assurances including new casing ratings and monitoring Page 1, DESCRIPTION (OPERATOR) - Form ID: 229372 |
2025-01-29 | General Oilfield Services |
| Tier 3 | Waiver for open hole logs, relying on offsetting well data Page 1, DESCRIPTION (OPERATOR) - Form ID: 229295 |
2025-01-30 | Regulatory / Permitting |
| Tier 3 | Waiver for filter sock container requirement during drilling phase Page 1, DESCRIPTION (OPERATOR) - Form ID: 229310 |
2025-01-29 | Regulatory / Permitting |
| Tier 3 | Request for suspension of drilling for up to 90 days using a small drilling rig with freshwater mud, followed by a larger rig within the 90-day window⏱ URGENT Page 1, DESCRIPTION (OPERATOR) |
Relative | Mud / Fluids |