| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Waiver for tubing/packer requirement, with assurances on casing integrity and monitoring for flowback pressures. ๐ Sundry Form - Tubing/Packer Waiver Deviation from standard completion practices, opting for casing-only setup with safety factors, revealing intent for simplified completion. |
2025-01-30 | Regulatory / Permitting |
| Tier 2 |
Use of wet shoe with ability to frac out the toe, positioned at 150' FNL & 100' FWL, with first perf 100' from hard line and 250' from section line. ๐ Proposed Casing Program and Stimulation Details Design choice for toe initiation via wet shoe frac, enabling frac-out without plug-and-perf, a non-standard completion method. |
Relative | Completions / Frac |
| Tier 3 |
Waiver requested for collection of drill cutting samples in vertical portion, relying on samples from offset well Cherrey 34-27 6H on the same pad to avoid redundant collection. ๐ Sundry Form - Request for Consideration/Waiver Non-routine regulatory choice to waive sample collection in vertical section, indicating intent to optimize efficiency by leveraging existing pad data rather than standard full collection. |
2026-01-29 | Regulatory / Permitting |
| Tier 3 |
Revision to casing program: Surface hole enlarged from 13.5" to 17.5", surface casing from 9.625" to 13.375" to accommodate larger hole size. ๐ Sundry Form - Request to Revise Casing and/or Cementing Plan Design modification post-permit approval, suggesting adaptive engineering to optimize drilling or completion, not evident in initial permit. |
2025-08-06 | General Oilfield Services |
| Tier 3 |
Request for suspension of drilling for up to 90 days to use a smaller rig for surface hole, allowing cost savings before deploying larger rig for full TD.โฐ TIME-SENSITIVE ๐ Sundry Form - Suspension of Drilling Non-standard operational choice to phase drilling with rig size escalation, deviating from continuous large-rig use to manage costs and timing. |
2025-03-07 | Drilling Rigs |
| Tier 3 |
Waiver for filter sock container during drilling phase, as filtration not used, exempting on-site container requirement. ๐ Sundry Form - Filter Sock Container Waiver Regulatory variance from standard NDAC requirements, indicating non-routine mud handling choice without filtration. |
2025-02-07 | Mud / Fluids |
| Tier 3 |
Waiver for open hole logs, relying on offset well Orville 4-9 1-H within 1 mile for formation tops, with GR-CBL from TD to surface. ๐ Sundry Form - Open Hole Log Waiver Non-routine logging choice to skip full open hole suite, using nearby well data, indicating cost optimization in data acquisition. |
2025-01-30 | Regulatory / Permitting |