๐Ÿ›ข๏ธ Cherrey 34-27 6H

Devon Energy Williston, LLC ยท Williams County, ND ยท File #41536 ยท Generated 2026-04-08 03:29

API
33-105-06415
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 2 Request for variance to NDAC 43-02-03-21 for tubing/packer requirement, citing safety factors and monitoring
๐Ÿ“„ WELL SUNDRY FORM - Tubing/Packer Waiver
Operator proposes alternative to standard tubing/packer setup, highlighting customized completion design
2025-01-29 General Oilfield Services
Tier 2 Backbuild Order Waiver for wells traversing adjacent spacing unit, with directional plan sharing
๐Ÿ“„ SUBJECT: Borsheim South Pad - Backbuild Order Waiver
Waiver allows drilling outside spacing unit, requiring inter-operator coordination
2025-01-02 Directional Drilling
Tier 3 Permit modification changing surface casing from 13.5 to 17.5 and intermediate from 9.625 to 13.375
๐Ÿ“„ WELL SUNDRY FORM - Request for Consideration/Waiver - Casing/Cement
Adjusts casing design post-initial permit, indicating adaptive engineering for wellbore stability
2025-08-06 General Oilfield Services
Tier 3 Suspension of drilling for up to 90 days to use smaller rig initially, with intent to complete laterโฐ TIME-SENSITIVE
๐Ÿ“„ WELL SUNDRY FORM - Suspension of Drilling
Non-standard drilling sequence to optimize rig utilization and costs
2025-03-07 Drilling Rigs
Tier 3 Waiver request for open hole logs under NDAC 43-02-03-31, relying on offsetting well data
๐Ÿ“„ WELL SUNDRY FORM - Open Hole Log Waiver
Operator avoids routine logging by referencing nearby well, suggesting data-driven efficiency
2025-01-30 Regulatory / Permitting
Tier 3 Request for waiver to NDAC Section 43-02-03-19.2 for filter media storage, approved for drilling phase only
๐Ÿ“„ WELL SUNDRY FORM - Filter Sock Container Waiver
Operator seeks exemption from standard filter sock container requirement, indicating non-standard mud handling practices
2025-01-29 Mud / Fluids
Tier 3 H2S Mitigation Plan implemented with specific ROE calculations and emergency procedures
๐Ÿ“„ HYDROGEN SULFIDE MITIGATION PLAN
Comprehensive plan for H2S risks, including fixed detectors and training, beyond standard protocols
2025-01-02 General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling and MWD Services
Ongoing surveys from November 16-26, 2025, with immediate need for accurate trajectory in horizontal section
Mud Engineering and H2S Mitigation
Pre-treatment and monitoring required during drilling, especially in potential H2S zones, with plan effective January 2025
Completion and Stimulation
Post-TD activities, with wet shoe design for frac-out, relevant after November 26, 2025 completion