| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Approximate proposed start date for drilling operations set to 8/15/2026.โฐ TIME-SENSITIVE ๐ DESCRIPTION (OPERATOR) under Suspension of Drilling Specific future date for mobilization, tied to suspension approval. |
2026-08-15 | Drilling Rigs |
| Tier 3 |
Permit renewal approved, extending expiration from 1/22/2026. ๐ REVIEWER COMMENTS under Sundry Type: Request to Perform Work, Type of Work: Permit Renewal Renewal indicates continued commitment to the well despite potential delays or changes in plans. |
2026-02-06 | General Oilfield Services |
| Tier 3 |
Request for suspension of drilling for up to 90 days to use smaller rig for cost and time savings, with surface hole set and plug placed.โฐ TIME-SENSITIVE ๐ DESCRIPTION (OPERATOR) under Sundry Type: Request for Consideration/Waiver, Suspension of Drilling Non-standard drilling approach using smaller rig initially, with strict 90-day limit and specific conditions to avoid altering lease obligations. |
2025-01-22 | Drilling Rigs |
| Tier 3 |
Waiver requested for open hole logs, justified by offset well B HAUG 14-19H within 1 mile with sufficient logs. ๐ DESCRIPTION (OPERATOR) under Sundry Type: Open Hole Log Waiver Deviation from standard logging requirements, relying on nearby offset data instead of full suite. |
2025-01-22 | Regulatory / Permitting |
| Tier 3 |
Use of Nabors X27 rig specified in drilling prognosis. ๐ DRILLING PROGNOSIS under DRILLING RIG Selection of specific rig model for vertical and horizontal drilling. |
Unknown | Drilling Rigs |